My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5916
>
Resolutions
>
Resolution 5916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 9:57:13 AM
Creation date
11/29/2016 9:56:40 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5916
Date
7/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 3 Six-year Transportation Improvement Program <br /> Agency Everett From 2008 to 2013 <br /> County No. 31 Hearing Date: <br /> City No. 420 <br /> MPO PSRC Adoption Date: <br /> Resolutionn No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding I Local Agency <br /> C. Project Title RIW <br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E.Beginning MP or road-Ending MP or road meet Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F.Describe Work to be Done Type_Status Length Codes Phase (mm/dd/yy)_Code Phase Code Funds _ Funds Funds (2008) (2009) (2010) 6th Type (MMM') <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 1{ .. 15 16 17 16 19 20 21 <br /> 14 5 2 phases In project 12 S 00 C PE 1/12008 STP(S) 135 135 135 CE <br /> Principal P CN 3/1/2009 STP(S) 765 765 765 <br /> Arterial (HES)Projects(Broadway/52nd St.;S.Broadway T <br /> at 52nd St.&at Madison St.;entrances to Forest 0 <br /> Park on Mukilteo Boulevard) <br /> Various safety,signal related improvements _ Totals 900 - 900 135 765 0 0 <br /> 14 6 3 phases in project 8 P 0.25 C PE 1/1/2010 AIP 250 250 500 500 <br /> Principal P RW 6/12011 AIP 500 500 1,000 1,000 <br /> Arterial Pacific Avenue/BNSF Grade Crossing Improvements T CN 6/12013 AIP 2250 2,250 4,500 4,500 <br /> Pacific Avenue and Chestnut Street 0 <br /> N/A to N/A <br /> Grade separation over BNSF rail line Totals _ 3,000 3,000 6,000 0 0 500 5,500 <br /> 14 7 1 phase in project 31 P 0 C PE 9/1/2008 75 75 75 <br /> Principal P <br /> Arterial Rucker Avenue/W.Marine View Dr.Connection Study T <br /> Rucker Avenue,W.Marine View Dr. 0 <br /> N/A to N/A <br /> Study altematives for new arterial connection Totals 75 75 75 0 0 0 <br /> 14 6 1 phase in project 31 P 0 C PE 1/1/2011 200 200 200 <br /> Principal P <br /> Arterial Interstate 5 to Port of Everett Truck Route Plan T <br /> Various Arterials within City's Central Business Dist. 0 <br /> N/A to N/A <br /> Study alternative truck routes between Port and I-5 _ Totals_ d�rryy _ 200 200 200 0 0 0 <br /> 14 9 1 phase in project 31 P 0 C PE 2/1200/-+ 200 200 200 <br /> Principal P VV <br /> Arterial Arterial Needs Studies T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Study Improvement needs-various classes of arterials Totals 200 200 200 0 0 0 <br /> 14 10 2 phases In project 31 P 0 C PE 2/12008 50 50 50 - <br /> Principal P CN 4/12009 350 350 350 <br /> Arterial Arterial Streetscaping Improvements T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Streetscaping improvements•various classes of arterials Totals 400 400 0 50 350 0 <br /> 14 11 2 phases in project 21 P 6.5 C PE 2/1/2010 TPP 150 150 300 300 <br /> Principal P CN 3/1/2011 TPP 1500 1500 3000 3000 <br /> Arterial SR 99/Evergreen Way Bus Rapid Transit Improvements T <br /> SR 99/Evergreen Way 0 <br /> 128th Street to Pacific Avenue <br /> Corridor improvements to accommodate BRT service TotalsI 1650 1650 3,300 0 0 300 3,000 <br /> 14 12 2 phases in project 05,06,12 P 0 C PE 2/1/2011 AIP 150 150 300 300 <br /> Principal P CN 4/1/2012 AIP 1500 1500 3000 3000 <br /> Arterial Mukilteo Blvd.Saftey&Capacity Improvements T <br /> Mukilteo Blvd. 0 <br /> Friday Avenue to western city limits <br /> Corridor improvements to enhance safety and capacity Totals 1650 1650 3,300 0 0 0 3,300 <br /> 16 1 2 phases in project 4 S 1 C PE 1/1/2002 AIP 431 796 1227 <br /> Minor P RW 7/1/2005 AIP 666 54 720 EA YES <br /> Arterial 112th Street SE 1-5 bridge widening T CN 8/1/2006 AIP 4,053 4,400 8,453 3,970 3/1/2006 <br /> 112th Street SE 0 CN 8/12008 STP(U) 2,500 2,500 <br /> 112th Street SE at Interstate 5 W _ <br /> _ Design,construct 5 lane street with bike&ped improv. Totals 2,500 5,150 5,250 12,900 3,970 0 0 0 <br /> 16 2 3 phases in project 4 S1 C PE 4/12007 STP(U) 103 AIP 155 258 158 <br /> Minor P RW 4/1/2009 STP(U) 1100 AIP 1,650 2,750 2750 MCE YES <br /> Arterial 112th Street SE Improvements T CN 7/1/2010 STP(U) 760 AIP 1,138 1,898 1,898 3/1/2009 <br /> 112th Street SE 0 <br /> Silver Lake Road to SR 527 W <br /> Design,construct five-lane street,bike,and pod improv. 1,983 2,943 0 4,906 158 2,750 1,898 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.