Laserfiche WebLink
Washington State Department of Transportation Page 7 Six-year Transportation Improvement Program <br /> Agency Everett From 2008 to 2013 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal_Funding Local Agency <br /> C. Project Title RNV <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road meet Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length_Codes Phase (mm/dd/yy)_ Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MMM') <br /> 1 23 4 5 6 7 8 9 10 11 _ 12 13 14 15 16 17 18 19 20 21 <br /> 19 4 2 phases in project 05 P 1.7 C PE 8/1/2011 50 50 50 <br /> Local P CN 6/1/2012 250 250 250 <br /> Street Upper Ridge&Lower Ridge Rd.street improvemt. T <br /> Constr. Upper Ridge,Lower Ridge,74th St.,76th St 0 <br /> Beverly Lane to 78th Street <br /> Design and construct street improvements Totals 300 300 0 0 0 300 <br /> 19 5 2 phases in project 05 P 0.2 C PE 8/1/2008 Other 200 200 200 <br /> Local P CN 6/1/2009 Other 1800 1800 1800 <br /> Street Simpson Site Access Improvements T <br /> Constr. Simpson Site,Snohomish Riverfront 0 <br /> Connection between Landfill and Simpson Sites <br /> Design and construct street improvements Totals 2,000 2,000 200 1800 0 0 <br /> 191 1 phase in project 12 P 00 C CN 5/1/2008 240 240 40 40 40 120 <br /> Local Traffic Signal Interconnect P <br /> Traffic Various locations within City limits T <br /> Signal Various streets to Various streets 0 <br /> Construct traffic signal interconnect Totals 240 240 40 40 40 120 <br /> 19 2 2 phases in project 12 S 00 C PE 1/1/2008 <br /> Local Traffic Signal Improvements(City-wide) P CN 6/1/2008 900 900 150 150 150 450 <br /> Traffic Various locations within City limits T <br /> Signal Various streets to Various streets <br /> Design,construct,install traffic signals Totals 900 900 150 150 150 450 <br /> 19 3 2 phases in project 12 P 0 0 PE 1/1/2008 CMAO 760 760 1520 600 CE <br /> Local ITMS/Transit TSP Upgrades CN 4/1/2009 500 500 No <br /> Traffic various locations city-wide; Evergreen Way BRT Corridor <br /> Signal various traffic signals;Evergreen Way(128th to Pacific) <br /> Implement ITMS system;TSP improvements Totals 760 760 1,520 0 600 500 500 <br /> 19 1 2 phases in project 6 S 00 C PE 1/1/2008 <br /> Local Neighborhood Block Grants P CN 9/1/2008 CDBG 360 360 60 60 60 180 No <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets to Various streets 0 <br /> Construct Improvements in various neighborhoods Totals 360 360 60 60 80 180 <br /> 19 2 Zphases in protect 6 P 00 C PE 1/12008 <br /> Local Neighborhood Traffic Mitigation Studies-Projects P CN 5/1/2008 2,400 2,400 400 400 400 1,200 <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets 0 <br /> Install traffic enhancements in Neighborhoods Totals 2,400 2,400, 400 400 400 1200 <br /> 19 1 2 phases in project 06 S 00 P PE 3/1/2008 30 30 5 5 5 15 <br /> Local 0 CN 7/1/2008 150 150 25 25 25 75 <br /> Landscap. City Entryway Landscaping and Signs <br /> Various Entryway Corridors within City limits <br /> Various Entryway to Various Entryway <br /> Design and Install Gateway landscaping and signs Totals 180 180 30 30 30 90 <br />