Laserfiche WebLink
Washington State Department of Transportation Page 8 Slxyear Transportation Improvement Program <br /> Agency Everett From 2008 to 2013 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs In Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title <br /> R/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MM/YY) <br /> 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 <br /> 19 1 STPE-EN94(013) 1 phase in project 32 S 0.10 CN 5/1/2008 STP(E) 400 100 500 500 CE No <br /> Local <br /> Non- Riverfront Walkway Overcrossing <br /> Motorized Riverfront Walkway <br /> BNSF Overcrossing at 41st St.Overcrossing <br /> Construct pedestrian overcrossing of BNSF Railway .. Totals 400 100 500 500 0 0 0 <br /> 19 2 STPE-0420(002) 1 phase in project 32 S 2 - P CN 5/1/2008 STP(E) 44 11 55 55 CE <br /> Local 0 No <br /> Non- Riverfront Walkway Phase I <br /> Motorized Riverfront Walkway <br /> Lenora Street to 41st Street Overcrossing <br /> Construct bicycle-ped path along Snohomish River Totals 44 11 55 55 0 0 0 <br /> 19 3 3 phases in project 32 P 0.3 C PE 1/1/2008 200 200 200 <br /> Local P <br /> 0 41st Street Connector T CN 12/1/2009 1,500 1,500 500 1000 <br /> Motorized 41st Street corridor O <br /> Interurban Trail to Riverfront Walkway <br /> Design and construct bike&ped improvements Totals 1700 1700 200 500 1000 0 <br /> 19 4 2 phases in project 32 S 1.25 C PE 7/1/2007 Other 63 63 <br /> Local P CN 5/1/2008 Other 353 353 353 <br /> Non- 7th Avenue SE Ped/Bike Improvements T <br /> Motorized 7th Avenue SE 0 <br /> 92nd Street to 112th Street <br /> Design and construct bike&ped improvements Totals 0 0 416 353 0 0 0 <br /> 19 5 3 phases in project 31 S/P 0.45 C PE 1/1/2007 DISCR. 350 100 450 CE <br /> Local P RW 5/1/2009 50 40 90 90 Yes <br /> Non- Henry M.Jackson Park Pedestrian Bridge T CN 7/1/2010 1600 560 2160 1160 1,000 <br /> Motorized East Marine View Drive 0 <br /> East Marine View Drive to Snohomish River <br /> Design,cosntruct bike-ped bridge to POE bike path Totals 2000 700 2,700 0 90 1160 1000 <br /> 19 6 2 phases in project 32 S 1.5 P PE 4/1/2007 70 70 140 140 <br /> Local 0 CN 4/1/2008 280 280 560 560 <br /> Non- Riverside Bus.Pk. Bike/Pedestrian Imprvmt. <br /> Motorized Riverside Bus.Park Trail <br /> East Marine View Drive to Jackson Ped Bridge <br /> Design and construct bicycle-ped.improvements Totals 350 350 700 140 560 0 0 <br /> 19 7 2 phases In project 32 P/S 3.4 C PE 8/1/2007 STP(E) 75 15 90 <br /> Local p <br /> CE 2/1/2008 <br /> Non- West/East Marine View Drive Bike-Ped Improvements T CN 8/1/2008 STP(E) 426 85 511 511 <br /> Motorized West and East Marine View Drive 0 <br /> Everett Avenue to North Broadway <br /> Design,cosntruct new and upgraded facilities for bikes and peds Totals 501 100 601 511 0 0 0 <br />