|
Washington State Department of Transportation Page 9 Six-year Transportation Improvement Program
<br /> Agency Everett From 2008 to 2013
<br /> County No. 31 Hearing Date:
<br /> City No. 420 Adoption Date:
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Infomiation Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title _ R/W
<br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required
<br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MM/YY)
<br /> 12 3 4 5 9 7 9 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 19 9 2 phases in project 32 P 0.5 C PE 1/1/2010 50 50 50
<br /> Local 0 CN 6/1/2011 450 450 450
<br /> Non- 47th Street Pedestrian Improvements
<br /> Motorized 47th Street
<br /> Evergreen Way to Black Forest Lane
<br /> Design and construct pedestrian improvements Totals 500 500 0 0 50 450
<br /> 19 10 3 phases In project 32 P 0.1 C PE 1/12009 50 50 50
<br /> Local 0 RW 7/1/2010 25 25 25
<br /> Non- Pigeon Creek No.1/BNSF Crossing CN 4/1/2011 850 850 850
<br /> Motorized Port of Everett Public Access Walkway,Pigeon Creek
<br /> Pigeon Creek No.1 Road/BNSF Railway
<br /> Construct bike-ped bridge or undercrossing Totals 925 925 0. 50 25, 850
<br /> 19 11 3 phases in project 32 P 0.4 0 PE 1/1/2011 150 150 150
<br /> Local RW 1/1/2012 50 50 50
<br /> Non- Grand Ave./N.Marina Ped/Bike Connection CN 5/1/2013 850 850 850
<br /> Motorized North Everett/Port of Everett
<br /> Grand Avenue to West Marine View Drive
<br /> Bike-ped connection Totals 1,050 1,050 0 0 0 1050
<br /> 19 12 3 phases in project 31 S C PE 4/1/2011 100 100 100
<br /> Local P
<br /> Non- Shoreline Access Improvements T CN 4/1/2012 900 900 900
<br /> Motorized City of Everett waterfront 0
<br /> Snohomish River/Puget Sound,various locations
<br /> Design,construct bicycle-ped paths along waterfront Totals 1,000 1,000 0 0 0 1,000
<br /> 19 13 2 phases in project 32,8 S,P 02 0 PE 11/1/2001 STP(E) 149 254 403 EA
<br /> Local PE 4/1/2009 CMAQ 318 1,000 1,318 1,319 No
<br /> Non- 1-5/Snohomish River Bicycle-Ped Bridge CN 4/12010 IAC 250 2,000 2250 2,250
<br /> Motorized Interstate 5 CN 4/1/2011 DISCR. 3,000 ALFA 783 1,246 5,029 5,029
<br /> East Marine View Drive to Langus Riv'ft.Park
<br /> Design,cosntruct bike-ped bridge over Snohomish River Totals 3467 1,033 4,500 9,000 0 0 1319 7279
<br /> 19 14 2 phases in project 32 P 0.5 0 PE 4/12011 100 100 100
<br /> Local
<br /> Non- Pigeon Creek Rd.No.1 Improvements CN 4/1/2013 900 900 900
<br /> Motorized Pigeon Creek Rd.No.1
<br /> Mukilteo Blvd.To BNSF Rail R/W
<br /> Design,construct bike/ped Improvements Totals 1,000 1,000 0 0 0 1,000
<br /> 19 15 3 phases in project 32 P 00 P PE 5/1/2008 150 150 30 30 30 60
<br /> Local O RW 8/1/2008 250 250 50 50 50 100
<br /> Non- Everett Non-Motorized Transportation Projects CN 9/1/2009 1,100 1100 280 280 540
<br /> Motorized Various locations within City Limits'(see below)
<br /> Various Locations to Various Locations
<br /> Design-construct ped&Bike Paths&Bike lanes Totals 1500 1500 80 360 360 700
<br /> • Candidate non-motorized improvements Include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street,
<br /> Bond Street,Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW,
<br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,
<br /> Cady Road,Fleming Street,75th Street,100th Street SW,and various shoreline public access projects
<br />
|