|
CITY OF EVERETT 2008 TO 2013 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIG- PE R/W CONST. Est.2008-13 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI i START START START Expenditures AGENCY NO.
<br /> 1 Interstate 1 1-5 Median HOV Lanes&Auxiliary Lanes SR 526 to US 2 Jan.99 Nov.04 May.05 50,000,000 WSDOT 1
<br /> 2 Interstate 2 I-5-41st Street Interchange 41st Street to US 2 Jul.03 Apr.06 50,000,000 WSDOT
<br /> 3 Interstate 3 I-5 112th Street SE Direct Arress HOV/PNR/Flyer Stops I-5 at 112th Street SE Jan.02 Jul.05 Jul.06 20,000,000 ST&WSDOT
<br /> 4 Interstate 4 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes.,and US 2 Jan.09 Jun.11 Sep.12 28,500,000 EVERETT
<br /> 5 Interstate 5 I-5/100th Street SE HOV access/undercrassing I-5 at 100th Street SE Jul.09 Jan.10 Jan.11 68,500,000 EVERETT
<br /> 6 Interstate 6 NB Everett Mall Way to SBI-5 Onramp Everett Mall Way to southbound IS Jan.09 May.10 3,500,000 WSDOT
<br /> 7 Interstate 7 1-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.10 Jun.11 Jul.12 10,000,000 Q EVERETT 0
<br /> 8 Interstate 8 IS/East Marine View Drive Interchange IS at East Marine View Drive Jan.09 Jun.10 Jun.12 16,000,000 g EVERETT 0
<br /> 9 Interstate 9 IS HOV Lanes US 2 to SR 528 Jan.12 Jun.16 May.18 5,000,000WSDOT 9
<br /> 10 Interstate 10 1-5/128th Street Interchange 1-5 at 128th Street Jan.08 Jan.10 May.12 11,000,0001 WSDOT 10
<br /> 11 Interstate 11 1-5/128th Street HOV Ramps(Mariner PNR) 1-5 at 128th Street/Mariner PNR Jan.08 Jan.10 May.12 6,000,000 WSDOT 11
<br /> 12 Interstate 12 IS/112th Street Interchange Study I-5 at 112th Street SE Jan.12 3,000,000 WSDOT 12
<br /> 13 Freeway 1 US 2 Improvements IS to SR 204 Jun.09 Jun.10 Jun.12 115,000,000 WSDOT 13
<br /> 14 Freeway 2 SR 526/Hardeson Road Interchange SR 526 at Hardeson Road Jun.10 Jun.11 Jun.13 9,000,000 WSDOT 14
<br /> 15 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.10 8,500,000 WSDOT 15
<br /> 16 Freeway 4 SR 526/Evergreen Way Interchange SR 526 at Evergreen Way Jun.13 Jun.15 Jun.17 38,000,000 WSDOT
<br /> 17 Principal Arterial 1 East Marine View Drive Improvements North Broadway to Interstate 5 Mar.03 Jul.05 Mar.07 8,800,000 EVERETT
<br /> 18 Principal Arterial 2 Broadway/Beverly Blvd.Intersection Impr. So.Broadway at Beverly Blvd. Oct04 Aug.07 683,000 EVERETT
<br /> 19 Principal Arterial 3 Evergreen Way Improvements,115th to Airport Road 11500 block to Airport Road Jan.10 Jul.11 425,000EVERETT 19
<br /> 20 Principal Arterial 4 Broadway Corridor Improvements SR 526 to 37th Street Feb.13 Feb.15 Jun.17 3,000,0001 EVERETT 20
<br /> 21 Principal Arterial 5 HES Projects(Brdwyat 52nd&at Madison,Forest Pk entrances) Ev.Mall Wy.,Broadway,Colby Ave. Jan.08 Mar.09 900,000 1 EVERETT 11
<br /> 22 Principal Arterial 6 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St. Jan.10 Jun.11 Jun.13 6,000,000 EVERETT
<br /> 23 Principal Arterial 7 Rucker AveJW.Marine View Dr.Connection Study Pacific Ave.and Wall Ave. Sep.08 75,000 EVERETT
<br /> 24 Principal Arterial 8 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 1-5 Jan.11 200,000 EVERETT
<br /> 25 Principal Arterial 9 Arterial Needs Study Various arterials within city limits Feb.08 200,000EVERETT
<br /> 26 Princi.al Arterial 10 Arterial Streetscaping Improvements Various arterials within city limits Feb.08 Apr.09 400,0001 EVERETT III
<br /> 27 Principal Arterial SR 99/Evergreen Way BRT Improvements 128th Street to Pacific Avenue Feb.10 Mar.11 3,000,000 EVERETT 23
<br /> 28 Principal Arterial Mukilteo Blvd.Safety Improvements Friday Avenue to city limits Feb.11 Apr.12 3,300,000 EVERETT 24
<br /> 29 Minor Arterial 112th Street SE I-5 Bridge Widening 112th Street at Interstate 5 Jan.01 Sep.02 Aug.06 3,970,000 EVERETT 25
<br /> 30 Minor Arterial 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jan.07 Mar.09 Jul.10 4,806,000 EVERETT 26
<br /> 31 Minor Arterial Lenora St/BNSF Rail Line Overcrossing Lenora St&Lowell Sno.River Rd. Jul.11 Jul.12 May.14 1,800,000EVERETi ili
<br /> 32 Minor Arterial 116th Street SE Improvements SR 527 to 35th Street SE Jan.09 Jul.10 May.11 3,800,0001 EVERETT
<br /> 33 Minor Arterial 100th Street SW Improvements Airport Road to Evergreen Way Feb.09 Jun.10 2,600,000EVERETT 29
<br /> 34 Minor Arterial Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road Mar.11 Mar.12 May 13 500,0001 EVERETT 30
<br /> 35 Minor Arterial 4th Avenue West Widening and Improvement 104th Street to 112th St SW Jan.10 Jan.11 May.12 9,000,000 O SNO.CNTY. mu
<br /> 36 Minor Arterial 0 Colby Avenue Streetscape Improvements 19th Street to 41st Street Feb.09 May.10 3,000,000 Q EVERETT KM
<br /> 37 Minor Arterial 9 100th Street SE Improvements SR 527 to 7th Avenue SE Jun.09 Jan.10 May.11 20,000,000 EVERETT
<br /> 38 Minor Arterial 10 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan.13 Jan.15 May.18 20,000,000 EVERETT
<br /> 39 Minor Arterial 11 110th Street SE Improvements SR 527 to 35th Street SE Jan.11 Jan.13 May.15 2,000,000 EVERETT
<br /> 40 Collector Arterial 1 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.11 Sep.12 Jun.13 16,000,000 EVERETT
<br /> 41 Collector Arterial 2 Holly Drive Non-Motorized Improvements 4th Avenue W.to 92nd Street Mar.07 Jun.08 800,000 Q EVERETT lall
<br /> 42 Collector Arterial 3 Bond Street Ped/Bike Improvements Kromer to Terminal Ave. Jun.03 Jan.04 Jul.07 250,000 EVERETT Q
<br /> 43 Collector Arterial 4 Chestnut St./Eclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.09 Jun.10 3,350,000 EVERETT 39
<br /> 44 Collector Arterial 5 36th Street/Smith Street Ped,Bike&Lndscp.Improv. Broadway to Eclipse Mill Rd.;36th to 33rd Jan.09 May.10 May.11 1,000,000 EVERETT 40
<br /> 45 Collector Arterial 6 36th Street/BNSF At-grade Rail Crossing Closure 36th St.&BNSF Rail Line Jan.09 Sep.09 Jun.10 200,000 EVERETT
<br /> 46 Collector Arterial 7 36th Street(or vicinityyBNSF Rail Line Ped/Bike Crossing 36th,38th,or 39th&BNSF Rail Line Jan.07 Nov.07 Jul.08 800,000 EVERETT
<br /> 47 Collector Arterial 8 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.09 Jun.10 500,000 EVERETT
<br /> 48 Collector Arterial 9 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan.09 Jan.10 May.11 1,000,000 EVERETT
<br /> 49 Collector Arterial 10 Silver Lake Road-121st St SE Ped.Improv. 112th Street to SR 527 Jun.09 Jun.10 Jul.11 500,000 ' EVERETT 45
<br /> 564,859,000
<br /> 'A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2007-2012 Six-Year TIP.
<br />
|