|
CITY OF EVERETT 2008 TO 2013 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE RNV CONST. Est.2008-13 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 50 Local Access-SAF 1 BNSF RR track relocation Pacific Avenue to Lowell Junction Jan.02 Dec.04 Jun.07 4,880,000_ EVERETT 46
<br /> 51 Local Access-SAF 2 BNSF RR safety improvements Various railroad crossings in Everett Jan.08 Jun.08 550,000 • EVERETT
<br /> 52 Local Access-SAF 3 Roadway Hazard Elimination Projects Various locations within city limits Jul.08 120,000 • EVERETT
<br /> 53 Local Access-PR/M 1 Annual Street Overlay Program Various streets within city limits Jan.08 Jul.08 6,000,000 EVERETT
<br /> 54 Local Access-PR/M 2 _Sidewalk repair and replacement Various locations within city limits Jan.08 May.08 360,000 EVERETT
<br /> 55 Local Access-PR/M 3 Pavement Marking Project Various locations within city limits Jan.08 May.08 210,000 EVERETT
<br /> 56 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov.09 Jun.10 650,000 • EVERETT 47
<br /> 57 Local Access-STR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.10 Apr.11 675,000 * EVERETT 48
<br /> 58 Local Access-STR 3 Pine Street Improvements Everett Avenue to Hewitt Avenue Jul.10 May.11 580,000 • EVERETT 49
<br /> 59 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. 74th Street to 78th Street Aug.11 Jun.12 300,000 • EVERETT 50
<br /> 60 Local Access-STR 5 Simpson Site Access Improvements Simpson Site,Snohomish Riverfront Aug.08 Jun.09 2,000,000 • EVERETT 51
<br /> 61 Local Access-SIG 1 Traffic Signal Interconnect Various locations within city limits May.08 240,000 EVERETT
<br /> 62 Local Access-SIG 2 Traffic Signal Improvements Various locations within city limits Jan.08 Jun.08 900,000 EVERETT
<br /> 63 Local Access-SIG 3 ITMS/TSP Upgrades Various signals in Everett Jan.08 Apr.09 1,520,000 EVERETT
<br /> 64 Local Access-NEI 1 Neighborhood Block Grants Various locations within city limits Jan.08 May.08 360,000 • EVERETT
<br /> 65 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Various locations within city limits Jan.08 May.08 2,400,000 • EVERETT
<br /> 66 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City Mar.08 Jul.08 180,000 • EVERETT
<br /> 67 Local Access-NM 1 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jan.99 May.08 500,000 EVERETT
<br /> 68 Local Access-NM 2 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue Jan.99 May.08 55,000 EVERETT
<br /> 69 Local Access-NM 3 _-41st Street Bike-Ped.Connector Interurban Trail to Riverfront Walkway Jan.08 Dec.09 1,700,000 ' EVERETT 52
<br /> 70 Local Access-NM 4 7th Avenue SE Ped/Bike Improvements 9nd Street SE to 112th Street SE _Jun.07 Aug.08 416,000 EVERETT 53
<br /> 71 Local Access-NM 5 Henry Jackson Park Ped Bridge _E.Marine View Drive to Riverside Bus.Park Jan.07 May.09 Jul.10 2,700,000 • EVERETT 54
<br /> 72 Local Access-NM 6 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.07 Apr.08 700,000 ' EVERETT 55
<br /> 73 Local Accecc-NM 8 West/East Marine View Drive Bike-Ped Improvements Alverson Bridge to North Broadway Aug.07 Apr.08 250,000 • EVERETT 56
<br /> 74 Local Access-NM 9 47th Street Pedestrian Improvements Evergreen Way to Black Forest Lane Jan.10 Jun.11 500,000 • EVERETT 57
<br /> 75 Local Access-NM 10 Pigeon Creek No.1/BNSF Crossing Port of Everett Public Arrwcs Walkway to Pigeon Crk Rd Jan.09 Jul.10 Apr.11 925,000 • EVERETT 58
<br /> 76 Local Arrwcs-NM 11 Grand Ave./N.Marina Ped-Bike Connection Grand Ave.to W.Marine View Drive Jan.11 Jan.12 May.13 1,050,000 • EVERETT
<br /> 77 Local Access-NM 12 Shoreline Access Improvements Various locations within city limits Apr.11 Apr.12 6,000,000 * EVERETT
<br /> 78 Local Access-NM 13 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.11 9,000,000 • EVERETT 59
<br /> 79 Local Access-NM 14 Pigeon Creek Road No.1 Improvements Mukliteo Blvd to BNSF R/W Apr.11 Apr.13 1,000,000 • EVERETT 60
<br /> 80 Local Access-NM 15 Everett Non-Motorized Projects- Various locations within city limits May.08 Aug.08 Sep.09 1,500,000 • EVERETT
<br /> ••Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 48,221,000
<br /> Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW,
<br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road,
<br /> Fleming Street,75th Street,100th Street SW,and Shore Avenue/Edgewater Beach and various shoreline public access projects
<br /> *A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2007-2012 Six-year TIP.
<br /> Local Access Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement;
<br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement
<br />
|