Laserfiche WebLink
Six Year Transportation Improvement Program <br /> Instructions for Completing the Form <br /> 8. Project Phase. Select the appropriate phase code of the project. <br /> PE -Preliminary Engineering, including Design (or Planning) <br /> RW - Right of Way or land acquisition <br /> CN -Construction only(or transit planning or equipment purchase) <br /> ALL -All Phases from Preliminary Engineering through Construction <br /> (Use only in Years 4, 5, &6) <br /> 9. Phase Start Date. Enter the month/day/year(in MM/DD/YY format)that the selected <br /> phase of the project is actually expected to start. <br /> 10. Federal Fund Sources. Enter the Federal Fund Source code from the table below. <br /> FTA Discretionary for Capital Expenditures <br /> BIA -Bureau of Indian Affairs 5307 -FTA Urban Areas <br /> BR - Bridge Replacement or Rehab. 5309(Bus) - Bus <br /> CBDG -Community Development 5309(FG) - Fixed Guideways <br /> Block Grant(HUD) 5309(NS) - New Starts <br /> CMAQ -Congestion Mitigation Air Quality 5310 -FTA Elderly/Disabled <br /> DEMO -TEA-21 Demo Projects(Selected) 5311 - FTA Rural Areas <br /> Discretionary -Ferry Boat Discretionary, Public Lands REV -Rural Economic Vitality Program <br /> Highway, Scenic Byways, etc. STP(C) -STP Statewide Competitive Program <br /> DOD -Department of Defense STP(E) - STP Transportation Enhancements <br /> IC - Interstate Construction STP(S) STP Safety Including Hazard and RR <br /> IM -Interstate Maintenance STP(R) -STP Rural Regionally Selected <br /> NHS -National Highway System STP(U) -STP Urban Regionally Selected <br /> 3037 -FTA Job Access/Reverse Commute STP -STP(WSDOT Use Only) <br /> 11. Federal Cost. Enter the total federal cost(in thousands)of the phase regardless of when the funds will be spent. <br /> 12. State Fund Code. Enter the appropriate code for any of the listed funds to be used on this project. <br /> CAPP -County Arterial Preservation Program PWTF -Public Works Trust Fund <br /> CHAP -City Hardship Assistance Program RAP -Rural Arterial Program <br /> TPP -Transportation Partnerships Program SCP -Small City Program <br /> AIP -Arterial Improvement Program WSDOT -WSDOT funds <br /> PSMP -Pedestrian Safety&Mobility Program OTHER -Any other unlisted state fund codes <br /> PTSP - Public Transportation Systems Program <br /> 13. State Funds. Enter all funds from the State Agencies (in thousands)of the phase regardless of when the <br /> funds will be spent. <br /> 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the <br /> funds will be spent. <br /> 15. Total Funds. Enter the sum of columns 10, 12, and 14. <br /> 16-19. Expenditure Schedule-(1st, 2nd, 3rd,4th thru 6th years). Enter the estimated expenditures <br /> (In thousands) of dollars by year. (For Local Agency use.) <br /> 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this <br /> project. (This is required for Federally funded projects.) <br /> EIS - Environmental Impact Statement <br /> EA - Environmental Assessment <br /> CE -Categorical Exclusion <br /> 21. RNV Certification. If Right of Way acquisition is required, enter R/W Certification Date if known. <br /> (This is required for Federally funded projects .) <br />