|
Page 1 Six-year Transportation Improvement Program
<br /> Agency Everett From 2008 to 2013
<br /> County No. 31 Hearing Date:
<br /> City No. 420 Adoption Date:
<br /> MPO PSRC
<br /> Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A.Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B.Bridge No. Federal Funding Local Agency
<br /> C. Project Title - - - - R/W
<br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road mem Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy)_Code _Phase Code Funds Funds Fends (2008) (2009) (2010) 6th Type (MM/YY)
<br /> 1 23 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 21
<br /> 11 1 3 phases in project 4 S 5.6 0 PE 1/1/1999 N/SDOT 18,300 18,300
<br /> Interstate various RW 11/1/2004 WSDOT 20,000 20,000
<br /> I-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/2005 WSDOT 191,700 191,700 20,000
<br /> IS
<br /> SR 529(N.Broadway)to E.Marine View Drive
<br /> Design and construct Median HOV and GP aux.lanes - Totals _ 230,000_ 230,000 20,000 0 0 0
<br /> 11 2 3 phases in project 3 S 0.3 0 PE 7/1/2003 Disc 1,000 WSDOT 4,400 500 5,900
<br /> Interstate 5/630 P EA
<br /> I.5/41st Street SE Interchange&Related Improvements T CN 4/1/2006 WSDOT 42,844 42,844 21600
<br /> 1-5,41st Street CN Disc. 4,800 4,800 4800
<br /> S.3rd Ave.to Colby Ave;38th Street to 43rd Street 0
<br /> Design and construct interchange improvements Totals 5,800 47,244_ 500 53,544 26,400 0 0 0
<br /> 11 3 3 phases in project 3 S 0.1 0 PE 1/1/2002
<br /> Interstate 5/620 (Sound Transit is lead on project) P RW 7/1/2005 EA 2/1/2006
<br /> I-5/112th St.Direct Access HOV-PER/Flyer Stop T CN 7/12006 STP-U 2,500 20,000 20,000 10,000
<br /> 1-5,112th Street SE
<br /> 1-5/112th Street SE to I-5/112th Street SE _
<br /> Design/Construct HOV Ramps,PAR Lot,Flyer Stop _Totals - 2,500 - 20,000 20,000 10,000 0 0 0
<br /> 11 4 3 phases in project 3 P 1.1 0 PE 1/1/2009 `RTID 3,500 3.500 2000 1.500
<br /> Interstate RW 6/12011 RTID 2,000 2,000
<br /> 1.5/Downtown Everett Interchange Access Improvements CN 9/12013 RTID 23,000 10,800 13,000
<br /> 1.5 at Pacific,Hewitt,Everett Avenues
<br /> Pacific Avenue to Everett Avenue
<br /> Ramp and other arterial improvements at downtown interchanges Totals 28,500 28,500 0 2,000 1,500 15,000
<br /> 11 5 3 phases in project 1 P 0.1 0 PE 7/1/2013 RTID 5,000 5,000 1,500
<br /> Interstate RW 1/1/2015 RTD 2,000
<br /> 1.5/100th Street SE HOV Arrecv/Undercrossing CN 1/1/2018 RTID 61,500 10,800
<br /> 1-5,100th Street SE
<br /> SR 527 to South Everett Transit Center area
<br /> Design and construct HOV access/undercrossing Totals 88,500 68,500 0 0 0 1,500
<br /> 11 8 2 phases in project 1 P 0.5 0 PE 1/1/2009 RTID 500 500 500
<br /> Interstate 5/099
<br /> 1-5/Everett Mall Way Onramp CN 5/1/2010 RTID 3.000 3,000 3000
<br /> NB Everett Mall Way to SB I-5
<br /> NB Everett Mall Way to SB 1-5
<br /> Design and construct Interstate Onramp Totals 3,500 3,500 0 500 3,000 0
<br /> 11 7 3 phases in project 1 P 0.5 0 PE 1/1/2010 WSDOT 1,000 1,000 2,000 2,000
<br /> Interstate RW 6/1/2011 WSDOT 1,000 2,000 3,000 3.000
<br /> 1-5/Smith Island Freeway Interchange CN 7/1/2012 WSDOT 8.000 12.000 20,000 5,000
<br /> I-5 at 12th St.NE or SR 529
<br /> 12th St.NE or SR 529 _
<br /> Design and construct freeway interchange Totals 10,000 25,000 0 0 0 10,000
<br /> 11 8 3 phases in project 3 P 0.3 0 PE 1/12011 WSDOT 3,000 1,000 4,000 4,000
<br /> Interstate RW 6/1/2012 WSDOT 1,500 500 2000 2,000
<br /> 1-5/East Marine View Dr. Frwy.Interchange CN 6/1/2013 WSOOT 17,000 7,000 24,000 10000
<br /> 1-5 at East Marine View Drive FMSIB 5,000 5,000
<br /> 1-5 I E.Marine View Dr.
<br /> Add on and off-ramp to and from the north Totals 26,500 8,500 35,000 0 0 0 16,000
<br /> 1/ 9 3 phases In project 4 P 5.8 0 PE 1/1/2013 WSDOT 18,300 18,300 5000
<br /> Interstate Various RW 8/12017 WSDOT 20,000 20,000
<br /> 1-5 Median HOV Lanes CN 5/1/2019 WSDOT 191,700 191,700
<br /> Interstate 5
<br /> US 2 to SR 528
<br /> Design and construct Interstate median HOV lanes Totals 230,000 230,000 0 0: 0 5,000
<br /> 11 10 3 phases in project 3 P 0.3 0 PE 9x12013 RTID 14,000 14,000 2,000
<br /> Interstate RW 1/1/2019 RTID 25,000 25,000
<br /> I-5/128th Street Interchange CN 5/1/2021 RTID 140,000 140,000
<br /> IS at 128th Street
<br /> IS at 128th Street
<br /> Design and construct single-point urban interchange Totals 179,000 179,000 0 0 0 2,000
<br />
|