Laserfiche WebLink
i " <br />Element 412: Manage the Project <br />a) This is not a development project. No land clearing or grading are proposed for <br />this project. The existing landscaping and lawn in the construction zone around <br />Building 4 will be retained as much as possible. Erosion of sediment at this site <br />will be minimal. <br />b) No trees are being proposed to be removed. The only work on the exterior of the <br />building is to se new roof trusses and to install new windows, wall sheathing and <br />siding at the northerly portion of the building that will be performed from either <br />fixed scaffolding of pump jacks. This will result in minimal impact to existing <br />landscaping and lawn areas. <br />c) Since the construction work will occur between October 1 and April 30, soil <br />disturbing activities will be minimized. Existing vegetation will be retained in the <br />construction zone throughout the project along with proposed erosion and <br />sedimentation controls (silt fence) will significantly reduce the potential for any <br />silt -laden runoff to occur during this project. <br />d) The project engineer will review the condition of the erosion and sedimentation <br />control facilities on a regular basis when at the site. The contractor will maintain <br />and repair as needed the temporary erosion and sedimentation control facilities as <br />directed by the project engineer. <br />14037B C-SWPPP Narrative <br />0 • 1 <br />