My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 75TH ST SE 2021-12-28
>
Address Records
>
75TH ST SE
>
801
>
801 75TH ST SE 2021-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 12:14:33 PM
Creation date
11/29/2016 9:56:57 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JRP <br />ENGINEERING, INC. <br />NARRATIVE P�v 11A\� -04, Z <br />CONSTRUCTION STOR.MWATER POLLUTION PREVENTION PLAN <br />Fire Damage Repairs <br />Building 4 <br />Beverly Village Apartments <br />801 — 75th Street S.E. <br />Everett, Washington <br />November 7, 2014 <br />This narrative provides recommendations for temporary erosion control measures to be <br />implemented during the repair construction to Building 4 at the Beverly Village <br />Apartments resulting from a fire that occurred on July 20, 2014. This narrative also <br />provides measures for restoring landscaping and lawn areas at the site around the <br />building to the condition that existed prior to the fire. This narrative was prepared in <br />conjunction with a Site Plan Drawing that shows the temporary erosion control measures <br />recommended to be implemented during the course of the repair project and the <br />recommended repairs to landscaping, shrubbery and lawns that currently exist around the <br />building so as to restore the site to the condition that existed prior to the fire. <br />The fire destroyed the roof of the building and heavily damaged siding in the northerly <br />portion of the building. Water used to extinguish the fire also damaged the interiors of all <br />of the apartment units. The repair project for Building 4 generally consists of the <br />following: <br />1. The entire roof structure will be removed and properly disposed of. <br />2. All interior gypsum wallboard throughout the building will be removed and properly <br />disposed of. <br />3. All appliances and cabinetry will be removed and replaced. <br />4. The siding and windows in the north portion of the building will be removed along <br />with all wall sheathing. Isolated fire damaged framing will be removed and replaced, <br />5. A new roof truss structure will be installed throughout the building to match the <br />configuration of the original roof. <br />19929 Ballinger Way NE, Suite 101 . Shoreline, Washington 98155 <br />14037B C-SWPPP Narrative Tel. (206) 361-7100 • Fax (206) 362-3234 <br />Toll Free (877) 229-5009 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.