My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 75TH ST SE 2021-12-28
>
Address Records
>
75TH ST SE
>
801
>
801 75TH ST SE 2021-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 12:14:33 PM
Creation date
11/29/2016 9:56:57 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. New windows, sheathing and siding will be installed throughout the northerly portion <br />of the building. <br />7. Anew patio slab will be installed outside Unit 411 on the west side of the building <br />near the north end. <br />8. The interiors of the apartment units will be reconstructed to match their original <br />configuration. <br />9. The landscaping, shrubbery and lawn areas will be restored to the condition that <br />existed prior to the fire. <br />At the start of the project to design the repairs, we received a copy of the architectural <br />plans from the time when the building complex was constructed. The original plans <br />include a site plan and civil plans showing site drainage. We have visited the site several <br />times and have verified that the site topography, drainage system and site landscaping all <br />are constructed in the field in close conformance with the drawings made for the <br />construction of the building complex originally. We have also discussed the site <br />geotechnical conditions with ZipperGeo Associates. <br />This narrative discusses the required elements of the C-SWPPP to be implemented during <br />the course of the construction project and addresses each of the 12 required elements <br />identified in Section 2.4 of Volume II the City of Everett Stormwater Management <br />Manual. Where pertinent information is shown on the Site Plan drawing, the narrative <br />will cross reference the drawing. <br />Our response to the 12 required elements for the C-SWPPP are as follows: <br />Element #1: Mark Clearing Limits <br />a) No grading and clearing is proposed for this repair project. There are no sensitive <br />areas in the area of Building 4. Two trees are in the construction zone around <br />Building 4, which are shown on the Site Plan drawing to be marked and protected <br />in the field throughout the course of the construction project. <br />b) Since no clearing is proposed, no clearing fence is proposed for this construction <br />site. <br />c) The limiting area of construction activity around Building 4 is shown on the Site <br />Plan drawing. The existing lawn and shrubbery will be left in place so as to <br />minimize surface erosion during the winter months while the construction project <br />is on -going. A duff layer will be placed to temporarily cover the open landscape <br />14037E C-SWPPP Narrative A' <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.