My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
834 80TH ST SW BRAY INTERNATIONAL 2017-01-13
>
Address Records
>
80TH ST SW
>
834
>
BRAY INTERNATIONAL
>
834 80TH ST SW BRAY INTERNATIONAL 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 7:20:16 AM
Creation date
11/29/2016 11:36:35 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
834
Tenant Name
BRAY INTERNATIONAL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � <br />2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Jan 2014 <br />Project Info Project Address gray International Date 9/12/2014 <br />Compliance 80th Street Venture For Building Department Use <br />forms do not 834 80th Street <br />require a <br />password to Everett, WA <br />use. Instructional Applicant Name: Lance Mueller Architects <br />and calculating <br />cells are write- Applicant Address: 130 Lakeside, Suite 250 <br />protected. <br />Applicant Phone: 206-325-2553 <br />Project Description ❑ New Building ❑ A,ddition � Alteration ❑ Plans Included I <br />Lighting Compliance Path <br />Lighting Power Allowance <br />Method Selection required to <br />enable LPA forms <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />Q Lighting Power Density Calculations <br />� Building Area Method <br />� Total Building Performance <br />(If Total 8uilding Performance then only LGT-CHK is required.) <br />QQ Space-By-Space Method <br />New flourescent and incandescent lighting within existing building. Tenant space has not <br />been occupied before. New ceiling and light fixtures will be provided per this permit. <br />All lighting controls, occupancy sensors and commisioning will be by electrical contractor. <br />Additions and Chan�e of Snace Use (C101.4.3 & <br />❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />� Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable <br />provisions per C101.4.3 <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use space. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting confrols per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />� 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed wattage within the lighting retrofit space in Maximum Allowed Wattage table and proposed (including existing) lighting wattage in <br />Proposed Wattage tab/e. Retrofit and non-retrofit spaces shall be documented separately using multiple forms. <br />❑ Less than 60% of luminaires in space replaced <br />Provide a separate Space-By-Space Method (LTG-INT-SPACE) Compliance Form for this retrofit area. Document existing total wattage <br />within the lighting retrofit space in cell provided in the Maximum Allowed Wattage table. Document proposed (including existing) lighting <br />wattage in the Proposed Wattage table. <br />❑ Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />❑ New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />❑ New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of lighting <br />controls per C405.13. <br />� Space is reconfigured - luminaires unchanged or moved oniy <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />❑ No changes are being made to the interior lighting and space use not changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.