Laserfiche WebLink
,� . <br />C� <br />Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Bellevue, WA 98009 <br />RE: Final Letter for Building 12 <br />Silverlake Center <br />1905, 1907, 1909, & 1911 - <br />Our Job No. 19780 <br />• <br />C7VIL ENGINEERINCe;, Ll�ND PLANNING, SUR`JGYWG <br />January 28, 2016 <br />Eddy.stevens@Polygonhomes com <br />112th PI SE, Everett, Washington <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Buiiding Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Finai ior Building 12 at Siiverlake Cenfer is in <br />substantiai compliance with RCW 64.55 and is in substantial compliance with the approved drawings <br />(based on plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this office. Thank you. <br />I�espectfully, <br />� <br />�� f �_. <br />Hal P. Grubb, P.E. <br />Director of Engineering Services <br />HPG/ns <br />19780c.018 doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygnn Homes (via email) <br />Thomas Heinz, Polygon Homes (via ernar!) <br />Michelle Dittman, Polygon Homes (via ernail) <br />Frank Mellas, Sound Inspections, LLC (via emarl) <br />Nancy Scatt, Barghausen Consulting Engineers, Inc. <br />18215 72NU AVENUE SQUTH KENT, W�1 98032 (425} 257-6222 (4'�5) 251-8782 FAX <br />BI�ANCH OFFICES > TUMWATER, WA « �ONG BEACH, CA < F#OSEVILLE, CA • SAN DIEGO, CA <br />www.barghausr.i7.corri <br />