My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1905 112TH PL SE 2017-01-13
>
Address Records
>
112TH PL SE
>
1905
>
1905 112TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 4:41:27 PM
Creation date
11/29/2016 4:11:56 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
1905
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1� <br />v <br />m <br />February 9, 2016 <br />ES-3588.01 <br />Polygon Northwest <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention: Mr. Thomas Heinz <br />• <br />�• 3 �� j <br />��+ <br />.. �"'` • :x � <br />1 �'�4„ '3,��: <br />�5�� � <br />;.4��., su�a,; <br />�arfi� ���I�t�vns �W ��c <br />� (,r�ol��chnir,�) En�;inecrin�; <br />� Cor�sirur:Ci<m Monitoring <br />* F�nviruriiYien;al Sc:ience'rs <br />Subject: Final Report— Building 12, Lots 12.1, 12.2, 12.3, and 12.4 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />1905, 1907, 1909, and 1911 — 112th Place Southeast <br />Everett, Washington <br />City of Everett Permits C1 411-083, C1 411-084, C1 411-085, and C1 411-086 <br />Dear Mr. Heinz: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from Ap�il 2S, 2015 to January 8, 2016. Our <br />representatives made five site visits to observe or test building foundation subgrade, building <br />slab backfill, and pervious pavement preparation. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />af the proposed structure. <br />Our representative conducted eight field density tests in accordance with ASTM Test <br />Designation D2922 (Nuclear Gauge Method). Two representative soil samples were returned <br />to our laboratory for analysis of #he maximum dry density and optimum maisture content in <br />accordance with ASTM D1557-02 (Modified Proctor}. Density test results indicate adequate <br />compaction of at least 95 percent at the tested locations of the building slab backfill. <br />Our representative observed the contractor prepare the driveway for pervious pavement <br />according to the specification in the designed plans. In accordance with the designed plans, <br />our representative conducted the bucket test an the pervious pavement and observed it to <br />drain as intended. <br />f., - � ��.�.. ;ti_r, �,. ._ ,,. � . _ � ,, � �.. . '��-_ ��'� , I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.