Laserfiche WebLink
Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Bellevue, WA 98009 <br />CIVIL ENGIPIEERING, LAND PLANNING, SIJRVEYIiVG <br />January 28, 2016 <br />Eddy.sfevens@Palygonhomes.com <br />RE: Final Letter for Suilding 12 <br />Siiverlake Center <br />1905, 1907, 1909, & 1911 - 112th PI SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Buiiding Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final fior Building 12 at Silverlake Center is in <br />substantial compliance with RCW 64.55 and is in substantial compiiance wifih the approved drawings <br />(based on plans prepared by Milbrandt Architects dated February 4, 2015}. <br />if you have any questions or need additional information, please contact me at this office. Thank you. <br />Respectfiuily, <br />.�,,��'' _- <br />Hal P. Grubb, P.E. <br />Director of Engineering Services <br />HPG/ns <br />19780c.018.doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (vra email) <br />Thomas Heinz, Polygon Nomes (via email) <br />Micheile Dittman, Polygon Homes (vra email) <br />�rank Mellas, Sound Inspections, LLC (via emarl) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />18215 l2ND t�VENUE SOUTN KENi, W6� 98032 (425) 251-G2?_2 (425) 251-878? FAX <br />QRANCI-i OFFIC�S « TUMWA7E1-1, WA d LONG BEACH, CA • ROSEVILLE, CA ^ 5AN DIEGO, CA <br />www.baryhausen.com <br />3i7 <br />