Laserfiche WebLink
Geotechnical Report - Revised <br />Proposed Apartments: 1002, 1006, and 1008 Broadway Street, Everett, Washington <br />May 12, 2015 <br />Point loads located close to tltie top of the wall, such as outriggers of heavy ci-anes, may <br />apply additional loads to the lagging. These loads, if applicable may need to be <br />individually analyzed. <br />We recommend voids behind the lagging be bscktilked with CDF. <br />S.4 ECOLOGY BLOCK SIIORINC <br />Ecology blocks consist of concrete blocks with a iypical dimension of 2 feet high, 2 feet <br />deep and 6 feet long. Based on the encountered soil conditions, in our opinion, ecology <br />blocks can Ue used to shore the lower portion of the west excavation with a maximum <br />height of tluee blocks, or G feet, with a 6V:1H (Vertical:Ho�izontal) batter. The blocks <br />should be placed in a running bond pattern and the space between the blocks and <br />excavation backfilIed with clean crushed rock meeting the requirements for Permeable <br />Baliast in the WSDOT Standard Specifications, Section 9-03.9(2) (WSDOT, 2014), or an <br />approved equivalent. Clean rounded gravel such as pea gravel or washed gravel/drain <br />rock should not be used to backiill the block wall. <br />The base course of blocks should be embedcled at least one f'oot below the construction <br />subgi•ade elevation. The grade above the wal) may be sloped at a 1 H:1 V inclination. <br />The ecology block shoring may be placed in alignment with the walls of the building and <br />can be used as the backl'orm for the permanent basement watls. <br />The joints between the blocks will allow groundwater to seep tiu�ough the shoring. As the <br />wall will be faced by the concrete basement walls, it will be necessary to provide <br />drainage to collect the seepage and pi•event hydrostatic pressures from building up behind <br />the wall and concrete facing. For this application, a geotextile s4ieet drain incorporating a <br />filter fabric such as Miradrain b000, or equivalent, siiould be used. The sheet drain <br />should connect to piping extending t}u•ough the basement wall thai connect to a collector <br />pipe on the inside edge of the perimeter foundation. <br />We recommend the ecology blocks be stockpiled on site before commencing with the <br />excavation. This will allow for placing the blocks as the excavation progresses. PanGEQ <br />personnel sliould also be on site to observe the stabi(ity of the exc�vation and to monitor <br />the ecology block wall constiuction. <br />15-p43 1008 Broadway, Revised Page 12 PanGEO, [ne. <br />