Laserfiche WebLink
Geoteclinical Report - Revised <br />Proposed Apartments: 1002, 100b, and 1008 Broadway Street, Everett, ��ashington <br />Mav 12, 2015 <br />If the excavltion cannot be accomplished using ecology bSock shoring, then consideration <br />should be given to using a shoring system consisting of cantilevered soldier piles with <br />timber lagging. <br />S.S BASELING SURV�Y ANU MONITORING <br />Ground movements will occur as a result of excavatio�i activities. As such, ground <br />surface elevat'rons of the adjacent propeirties and city streets should be documented prior <br />to commencing earthwork to provide baseline data. ns a mi�iitnum, optical survey points <br />should be established at the following locations: <br />• The top of every otlier soldier pile. Tliese monitoring points sl�ould be <br />monitored twice a week. The monitoring frequency may be reduced based on <br />the monitoring results. <br />• Adjacent structures such as residences, garages, or retaining walls located <br />within 25 feet of the planned shoring. <br />The monitoring program should include monitoring for changes in both the horizontal (x <br />and y directions) and vertical deformations. The monitoring should be performed by the <br />contractor or the project surveyor, and the results should be promptly submitted to <br />PanGEO for review. The results of the monitoring will allow the design team to confirm <br />design parameters, and for the contractor to make adjustments if necessaiy�. <br />We also recommend that the existing cociditions along the public right of way and tlie <br />adjacent �rivate properties be photo-documented priw� to commencing earthwork at the <br />site. <br />6.0 FARTIIW�RK CONS1llERATIONS <br />b.l MATtiR1AL RE;USE <br />The native soils underlying the site are rnoisture sensitive, and wil] become disturbed and <br />soft when exposed to inclement weather conditions. We do nof recommend reusing the <br />native soils as structural fi1L If it is planned to use the native soil in non-structural areas, <br />the excavated soil should be stockpiled and protected with plastic sheeting to prevent it <br />fr-om �ecoming saturated by pi�ecipitation ol� runoff. <br />15-045 1008 Broadway, Revised PBge � 3 P�t?GF:�, Ine. <br />