Laserfiche WebLink
Geotechnical Report - : __ :�ised <br />� ' Proposed Apartments: 1002, 1006, and 1008 Broadway Street, Everett, Washington <br />May 12, 2015 <br />have been correctly interpreted and adequately implemented in the construction <br />documents. <br />3.0 SUBSURFACE EXPLORATIONS <br />3.1 SITE GEOLOGY <br />General geologic information far the project area was obtained by reviewing thc <br />Geologic Map of the Marysville Quadrangle, Snohomish County, Washington (Minard <br />1985). Based on our review, the project site is underlain by Vashon Till — Geologic Map <br />Unit Qvt�. Vashon Till consists of an unsorted deposit (diamict) of clay, silt, sand and <br />gravel that has been glacially transported and deposited. This soil has been directly <br />deposited by a glacier and overridden by several thous�nd feet of glacial ice a.nd is <br />typically dense to veiy dense. <br />3.2 SussuRracE EaPLouA�r�oN <br />Three borings were drilled on the south parcel located at 1008 Broadway on March 3, <br />2015. The borings were drilled using an Acker Soil Mechanic, limited access drill rig <br />operated by Boretec, Inc. subcontracted to PanGEO and were logged by an engineering <br />geologist with our finn. The borings were drillecl to a maximum depth of 8 feet below <br />existing grade. The approxiinate boring locations were located in the field by measuring <br />fi•om property coiners and site features and are sllown on Pigure 2, Site and Exploration <br />Plan. <br />Standard Penetration Tests (SPT) were performed at 2'/z- to 5-foot depth intervals using a <br />standard, 2-inch diameter split-spoon sampler. The sampler was advanced with a 140- <br />pound drop hammer falling a distance of 30 inches for each strike, in general accordance <br />with ASTM D-1586, Standa�d Test Method ,for Penetf�ation 7est and Splzt Barrel <br />Sc�mpling of Soils. <br />The soils were logged in generai accordance with ASTM D-2487 Standard P�°actice fo� <br />Classification of Soils for Engineering Pitrposes and the system summarized on Figure <br />A-1, Terms and Symbols for Boring and Test Pit Logs. <br />On May 7, 2015, we returned to the site and excavated three test pits by hand on the <br />center (1006 Broadway) and north parcel (1002 Broadway) to confirm the soil conditaons <br />ol� thesc parcels are consistent with the soil conditioils o�l the south pat•cel. <br />� <br />l_>-U-4S 10OS l3rua<l�cay_ Rcvi'scd �l�e J Ptin�iL',�9 IIIG. <br />