My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2615 W CASINO RD MARKET READY 2017-01-13
>
Address Records
>
W CASINO RD
>
2615
>
MARKET READY
>
2615 W CASINO RD MARKET READY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 5:31:18 PM
Creation date
12/1/2016 9:46:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2615
Tenant Name
MARKET READY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Jan 2014 <br />Project Info Project Address paine Field Bldg. 5 ste. I Remodel Date 9/18/2015 <br />Compliance 2615 W Casino Rd For Building Department Use <br />forms do not <br />require a <br />password to Applicant Name: <br />use. Kendahl Fulkerson (Ware Malcomb) � <br />Instructronal and qpp�icant Address: 22002 64th Ave W, Ste. 2C, Mountlake Terrace, WA 98043 �-J �� ��� _�� � 2' <br />calculating cells <br />are write- Applicant Phone: q25-670-6706 <br />Project Description I'� New Building ',J Addition I_; Alteration IJ Plans Included <br />Lighting Cornpliance Path <br />Lighting Power Allowance <br />Method Selection required to <br />enable LPA forms <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />�� Lighting Power Density Calculations <br />� Building Area Method <br />� Total Building Performance <br />(If Total Building Performance then only LGT-CHK is required.) <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />;J Space-By-Space Method <br />❑ Addition area or Change of Spaee Use area complies with all applicable provisions as stand alone project <br />- Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable <br />J provisions per C101.4.3 <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (includrng existing if applicableJ lighting wattage of Addition or Change of Use space. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting controls per C405. i3. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />'] 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed wattage within the Irghting retrofii space in Maximum A/lowed Wattage tab/e and proposed (inc/uding existing) lighting wattage in <br />Proposed Wattage fable. Ret�ofit and non-retrofit spaces shall be documented separately using multiple forms. <br />I� Less than 60% of luminaires in space replaced <br />Provide a separate Space-By-Space Method (LTG-INT-SPACE) Compliance Form for this retrofit area. Document existing total wattage <br />within the lighting retrofif space in cel/ provided in the Maximum AI/owed Wattage tab/e. Documeni proposed (inc/uding existing) /ighting <br />wattage in the Proposed Wattage table. <br />J Lamp and/or ballast replacement within existing luminaires only - existing total interior building wattage not increased <br />JI New wiring installed to serve added fi�ures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />n New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of Irghiing <br />conirols per C405.13. <br />�ii Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable /ighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />I�, No changes are being made to the interior lighting and space use not changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.