Laserfiche WebLink
Providence Hospice and Home Ca�e u� Snohomish Co <br />Chaptei• 246-335 WAC Hospice Care <br />New 16 Bed Hospice Center <br />T17 Provide a detailed written construction plan. This plans needs to include things such as but not <br />limited to the following. <br />1) Impact mitigation on the floor or floors below. <br />2) Infection control. How the dust, and etc, that will be keep the sun•ounding areas are free <br />from dust, noise, fumes, odoi�s, and etc. <br />3) The path for construction materials. <br />4) The path, method, and means of removing the construction demolition debris. <br />WAC 246-335-195 (1)(d) <br />T18 EnsLue that rooins have the proper pressure relationships to adjacent areas to proinote proper <br />infection conti•ol. <br />WAC 246-335-165 <br />"1,1 � llelincate the nlethod, iileans, storage location(s) ol�patienl records. <br />WAC 246-335-110 <br />T20 Delineate on the plans the location of inedical supplies. Explain the relationship between this <br />facility and the greater hospital in meeting the needs and demands for medical supplies/ <br />WAC 246-335-120 (1) <br />T21 Provide for storage for a limited supply of oxygen bottles. <br />WAC 264-335-155 (6)(b) <br />T22 Develop, prepare and submit and emergency plan. <br />WAC 246-335-170 <br />T23 Ensure your med-room has a lock on the door, has a locked cabinet, locked refrigerator, hand- <br />washing sink, soap dispenser, paper towel dispenser and is positively presstu•ed. <br />WAC 246-335-175 and WAC 246-335-220 <br />T24 Provide in yolu- small "family" kitchen a two compartment siiilc (that maybe �used for hand- <br />washing), soap dispenser, paper towel (or equal), a food preparation sink with an indirect drain, a <br />dishwasher that has water that reaches 165 degrees and etc. <br />WAC 246-335-225 and WAC 246-215-04325 and <br />WAC 246-215-04545 and WAC 246-215-05210 <br />T25 Provide a soiled utility room that meets all of the requirements. <br />WAC 246-335-240 <br />T26 Provide a drawing and final test report for the medical gas system, <br />WI�C 246-335-2_50 <br />Page 7 oi� 10 Plan Review Comil�ents for Project # 60542870 �� �' ���� <br />