|
GENERAL NOTES:
<br />7. VERIFv AND CONFIRM ALL DIMENSIOkS AND CCNDITi0N5. NOTIFY AT&T
<br />AND ARCHITECI OF ANv DISCREPANGES PRiCR i0 START OF wORK.
<br />2. �RAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE
<br />PRECEDENCE, �HIS SEf 0� DOCUMENTS IS INiENDED TO 8E USED FOR
<br />DIAG3AA�N�A"�C PURPOSES ONL�. UN��_E55 NOTED OTHERWISE THE
<br />GENERAL COrvTRACTOR'S SCOPE OF WORK 54ALL INCLUD� FURNISHING
<br />ALL MATERIALS, EOUIPMENT, LABOR, AND ANY REOUIREMENTS DEEMED
<br />NECESSARY i0 COMP�ETE PROJECI AS OLSCRIBED IN THE DRAWINGS
<br />AaD OWNER'S PROJECI rAANUA'��.
<br />3. PRIOR TO THE SUBMISSION OF BIDS, CONiRACTORS INVOLVED SHALL
<br />VISIT THE JOB SITE TO `AMILIARIZE 1HEA�SELVES WITri ALL CON�ITIONS
<br />AFFECTING Tti_ PROPOS�D PROJECI. COM1'iRACTORS SHALL VISIT THE
<br />CONSTRUCTION SITE WITH THE CONSTRUCiION/CONiRACT DOCUMENTS 70
<br />VERIfY FIELD CONDITIONS AND CONFIRIA THAT THE PROJECT WILL BE
<br />ACCOMPLISHED AS SHOWN. PRICR i0 PROCEE�ING WITH
<br />CONSTRUCTION. ANV �RRORS. OMISSIpNS. 03 �ICCREPANCIES SHALL BE
<br />BROUGHT TO THE ATTENTIOM1 OF THE ARCHI7ECT/ENGINEER VERBALLY
<br />AND IN WRITING.
<br />4. Ai&T, AND THE ARCHITECTS/ENGINEERS HAVE MADE EVERY �FFORT TO
<br />SET FORTH IN THE CONSTRl1CTI0N AND CONiRACT DOCUMENTS THE
<br />COMPLEIE SCOP= OF WORK. CONTRAC10R5 BIDDING THE JOB ARE
<br />NEVERiHELESS CAUTIONED THAT I�.'�NOR OMISSIONS OR �RRORS IN THE
<br />�RAWINGS AND OR SPECIFICATIONS SrALL NOi EXCUSE SAID
<br />CONiRACTOR FROM COMPLEiING THE PROJECT AND IMPROVEMENTS IN
<br />ACCORDANCE WIiH THE INIENT OF THESE DOCUMENTS. THE BIDDER
<br />SIiALL BEAR iHE RESPONSIBILITY OF NOTIfYING (IN WRITING) AT&T, AND
<br />iHE ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR OMi5510N5
<br />PRIOR TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT
<br />OF 715CREPANCIES THE CCNTRAC�OR SHALL PRICE THE MORE COSTLY
<br />OR EXTENSNE WORK, UNLE55 DIRECTED OTHERW�.SE.
<br />5. THE CONTRACTOR SHALL SUPERv6E AND DIRECi THE PROJEC7
<br />DESCRIBED IN TH� CONTRACi DOC:IMENTS. THE CONTRACiOR SHALL
<br />BE SOLELY RESPONSIBLE FOR ALL CONSTRUC'�0�' NEANS, MEIHODS.
<br />TECHNIQUCS, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL
<br />PORTIONS OF THE WORK UNDER 1HE CONTRACT.
<br />6. THE CONTRACTOR SHALL INSTALL ALL EOUIPM�'�i AND MATERIALS
<br />ACCORDING 70 MANUFACTURER'S/VENDOR'S SPECIFiCAiIONS UNLE55
<br />NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE
<br />PRECEDENCE.
<br />7. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED
<br />SHALL BE IN STRICT ACCORDANCE WITH ALL APPLiCABLE CODES,
<br />REGULATIONS, AN� ORDINAN�ES. CONTRACiOR SHALL GIVE ALL NOTICES
<br />AND COMPLY WITH ALL LAWS, OR�INANCES, RULES, REGULATICNS AN�
<br />LAWFUL ORDERS OF ANY PUBLIC AUiHORIiY, MUNICIPAL AND UTILIiY
<br />COMPANY SPECIFICAiIONS, AND LOCAL AND SiATE JURIS�ICTIONAL
<br />CODES BEARING ON THE PERFORIAANC[ OF THE WORK.
<br />8. CONTRACTOR SHALL PROVIDE, AT THE PROJECT SIT�, A FULL SET OF
<br />CONSTRUCTiON DOCUMENTS UPDATED WITH 7HE LATEST REVISIONS AND
<br />ADDENDA OR CL4RIFICATIONS FOR USE B� ALL PERSONNEL iNVOLVED
<br />WITN THE PROJEC7.
<br />9. THE STRUCTURAL COMPDNENTS 0� ADJACENT CONSTRl1CT10N OR
<br />FACILITIES AR: NOT TO BE ALTERED 8� THIS CONSTRUCTION PROJECT
<br />UNLESS NOTED OTHERWISE. ENSL'RE THAT E%CAVATION DOES NOi
<br />AFFECT ADJACENI STRUCTURES.
<br />i0. SEAL ALI. PENETRATIONS TFIROUGH �IRE-RATED AREAS WITH U.L. LISTED
<br />OR FIRE MARSHALL APPROVE� MATERIALS IF APPLICABLE TO THIS
<br />FACILIiY AND OR PROJECT SITE.
<br />��. CONiRACTOR TO PROViDE A POR'ABLE FIRE EXTiNGU!SHER WITH A
<br />RATING OF NOi LESS THAN 2-A OR 2-A10BC WIiHIN 75 FEET TRAVEL
<br />DISTANCE TO ALL PORTIONS OF PROJFCT AREA DURING CONSTRUCTION.
<br />12 CONTRACTOR SHALL M1AKE NECESSARY PROVISIONS iD PROTECT E%6TING
<br />IMPROVEMENTS. EASEMENTS, PAVING. CURBING, E1C. DURING
<br />CONSTRUCTION. UPON COMPLETION OF WORK, CONTRACTOR SHALL
<br />REPAIR ANY DAMAGE 1HAT A�AV !,AVE OCCURRED �UE TO CONSTRUCTION
<br />ON OR ABCUT THE PROPERTY.
<br />13. CONTRACTDR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD
<br />FREE DURING CONSIRUCTION AND DISPOSE OF ALL DIRT, DEBR15, AND
<br />RUB8i5H. CONTRACTOR SHALL RE�10VE EOUi'A�ENT NOT S�ECIFI�D AS
<br />REMAINING ON THE PROPERiY OR PREMISES. SITE SHALL BE LEF-f IN
<br />CLEAN CONDITIDN AN� �REE FROA� PAINi SPOTS, DUST, OR SMUDGES
<br />DF ANY NATURE.
<br />14. THE CONTRACTOR SHALL RECENE WRITiEN AUTHORIZATiON TO PROCEED
<br />WITH CONSTRUC110N PRIOR i0 STARTING WORK ON ANY ITEM NOT
<br />CLEARLY �JEFINED B� iHE CONSTRUCiION �R4WING5/CONTRACT
<br />DOCUMENiS.
<br />15. �HE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED
<br />HOURS TO AVOIp D!SiURBING NORA�AL BUSMESS.
<br />16. THE CONTRACIOR SHALL PROVIDE AT&i. PROPER INSURANCE
<br />CERTIFICA7E5 NAMING AT&i. AS ADD!TIONA'. INSURED, AND AT&T. PROOF
<br />OF LICENSE(5) AND PE & PD INS'JRAN�E.
<br />17. CONiRACTDR SHALL BE RES?ONSIBLE FOR SCHEDULING AND
<br />COORDINATING ALL INSPEC�i0N5.
<br />18. CAUTIONI CALL BEF�RE YOU DiG! BURIED uTILITiES EX151 IN iHE
<br />AREA AND UTILI7�' INFDRMAT!ON SHOWN MAv NOT BE COMPLETE.
<br />CONTACT THE ONE-CALL ..� L.'�' �_OCA'E SERviCE A MINIMUM OF 48
<br />HOURS PRIOR �0 CONSiRUC"�OM1' IN WASNINGiON CA___
<br />1-B00-424-5555.
<br />_. CONiRACTOR i0 DOCUME�i ALL WORK PERFORMED WITH PHOTOGRAPHS
<br />AND SUBlJ�IT TO AT&T. ALONG WITH REDLINED CONSTRUC110N SE7.
<br />2D. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD 8Y
<br />NARKING UP (REDLININGJ THE APPROVED CONSTRUCTION SET AN�
<br />SUBMITTING THE REDLINED SET i0 Ai&`: UPO� COMPLETION.
<br />2t. FOR COLLDCATION SIiES: CONTACT TOWER OWNER REPRESENTATNE
<br />FOR PARTICIPATION IN B'�J WALK.
<br />22. CONTRACTOR IS i0 COORDINATE ALL POWER IN57ALLATION WITH POWER
<br />COI�PANV AS REOUIRED. CONTRACTOR TO REPORT POWER INSTALLATION
<br />COORDINATION SOLIiiION(S) 70 NETWORK CARRIER RFpR_SENTqTIVE,
<br />PROJECT CONSiRUCT10N MANAGER AND ARC�-'�'EC'.
<br />23. ANV SUBS�IiUT10N5 0�= MATERIALS AND/OR EOU'�PMENT, MUS� BE
<br />APPROV�D 9Y A"&i CONS-RUC?i0� MANAGER.
<br />GENERAL NOTES (CONT'D):
<br />24. WHERE AnCHORING TO A CONCRFT_ ROOF S�B, CONTRACTOR SHALL
<br />CONFiRM (PRIOR TO SUBMIiiING B�D) WITH CJNSULTiNG CONSTRUCTiON
<br />COORDINATOR AND ARCHI;ECT THE PRESENCE OF POST TENSiON
<br />TENDONS. �ONTRACTOR SHALL ,NCLl1DE PROVISIONS FpR %-RAY
<br />PROCEDORES ?0 LOCATE TNE TENDONS.
<br />25. CONTRACTOR SHALL USE STAINLE55 STEEL METAL LOCKING TIES FOR
<br />ALL CABLE TRAV TIE DOWNS AN� ALL OTH�R GENERAL TIE DOWNS
<br />(WH_RE APPLICABLE). P�ASTIC ZIP ilES SHALL NOT BE ?ERM�.nED FOR
<br />USE ON AT&T PROJECTS. RECOMMENDED MANl1FACT;IRER SHALL BE:
<br />PANDUIT CORP. METAL LOCKING 7IE5 MDDEL N0. MLT45-CP UNDER
<br />SERIES-304 (OR EOUAL). ?ANDUiT ?RODUCT DISTR19UTED BY TRIARC
<br />DF TACOMA, WA.
<br />26. MAINTAIN THE INTEGRI7Y OF iHE BUiLDING ENVELOP AND CONSTRUCT
<br />BARRIERS IN THE /+REA OF WDRK i0 PREVENT DAMAGE FROM WEATHER
<br />AND CONSTRUCiION DUST AND DE9R:5.
<br />27. THE CONTRACIOR SHALL NOTIFv TOWER NEIWORK CARRIER OF ANV
<br />ERRORS, �M'.SSIDNS, OR IN��N5IST=NCIES AS THE� MAY BE
<br />DISCOV�R_� I�u ?L4N5, ��CU�nENiS, NOiES, OR SPECiFIC/'�OnS PRIOR
<br />i0 STARTING CONSTRUCiION iNCLUDING, BUT NOT LIMITEO B�,
<br />DEMOLITION. '4E CON7RACi0R SHALL 9E RESPONSIBLE FOR CORRECTING
<br />ANY _RROR, O+AISS'�.ON, OR IM1�ONS'.S�ENCY A�fER HE START 0�
<br />CONSTRUCTION WHIC'� hA5 NOT �3EEN BROUGHi i0 iHE ATiEM1T10N OF
<br />TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER AND
<br />SHALL INCUR ANV EXPENSES i0 R_C11FY THE SIiUAT10N. THE MEANS
<br />OF CORR_C-1NG ANY ERROR SHA',.L FIRST BE APPRCVED 9Y TOW�R
<br />NETWORK CARRIER CONSTRUCTiON ?ROJECi MANAGER.
<br />2B. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE. TOWER
<br />NETWORK CARRiER IS N0� RESPONSIBLE fOR ANV ERRORS RESULTING
<br />FROM TH��S PRACT�CE WRIiTEN �I�AENSIONS TAKE 7RECEDENCE OVER
<br />SCALE SHOWN ON PLANS.
<br />29. OWNER, CONIRACTOR, AND TOWER NETWORK CARRIER CONSTRUCTION
<br />PROJECi MAh�AGER SNALL MEET ,;OINTLY TO VERIFv ALL DRAWINGS AND
<br />SPECIFICAilONS PRIOR i0 THE S1ART OF CONSTRUCTIOM1.
<br />J0. A COPV OF GOVERNING AGENCY AaPROVED PLANS SHALL BE KEPT IN A
<br />PLACE SPECifiED BY THE GOVERNiNG AGENCY, AND 9v �W, SHALL BE
<br />AVAILABLE FOR INSPECTION AT ALL T:MES. �H� FIJNS ARE NOT TO 3E
<br />USED BY THE WORKMEN. ALL CDNSTRUCTiON SETS SHALL REFLECi iHE
<br />SAME WFORMATION AS GOVERNING AGENCY APPROVED PL4N5. THE
<br />CONTRACIOR S^ALL AL50 MAINTAIN ONE SEi OF PLANS, IN GOOD
<br />CONDITION, COMPLETE WiTH ALL REVISIONS, ADDENDA, AND CHANGE
<br />ORDERS ON THE PREMISES A1 ALL TIMES UND"cR THE DIRECT CARE OF
<br />THE SUPERIM[NDENi. THE CONTRACTOR S:-ALL SUPPLY TOWER
<br />NEIWGRK CARRIER C�NSTRUCTION PROJECT MANAGER. WITH A COPY DF
<br />ALL REVISIONS, ADDENDA, AND/OR CHANGE ORD_RS AT THE
<br />CONCLUSION OF THE WORK AS A PART OF THE AS-BUILT DRAWING
<br />RECORDS.
<br />31. THE CONTRACiOR SHALL STUDY THE STRUC?URAL, _LECT31CAL,
<br />MECHANICAL, ANO PLUMBING PLANS AND CRO55 CHECK THEIR DETAILS,
<br />NOTES, DIMENS10�5, AtiD ALL REOUIREMENiS PRIOR TO THE START OF
<br />ANv WORK.
<br />�2_ THE CONTRACIOR SHALL 6E RES?ONSIBL� �OR Tr.E COMPLE?E
<br />SECURIiY OF THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS
<br />uNTIL THE J09 IS COMPLETE.
<br />33. THE CONTRACTOR HAS TME RESPONSIBILItt OF �OCAi!NG ALL =XISTING
<br />UTILITIES WHETHER OR NOi SHOWN ON THE PLANS, AND TO PROTECT
<br />THEM FROM DAMAGE. THE COn'iRACTOR, OR SUBCONTRACTOR AS
<br />SPECIFIED IN THE AGREEMENT BE-WEEN SUBCONTRACTOR AND
<br />CONTRACTOR, SHALL BEAR THE E%PENSES OF REPAiR ANJ/OR
<br />REPLACEMENT OF UTILITIES OR OTHER PROPERTV DAMAGE BV
<br />OPERATIONS IN CONJU!JCiION WIiH iHE ExECUT10N OF 1HE WORK.
<br />34. THE REFERENCES ON THE DRAWINGS ARE POR CONVENIENCE ONLY AND
<br />SHALL NOT LIMIT THE APPLICATION OF ANY DRAWING OR DE7AIL.
<br />35. ALL DiNENSiONS ON T�.� ?�,NS ARE TO FACE OF STUD (E0.5.)
<br />UNLESS NOTED OTHERWISE (U.N.O.).
<br />36. ALL Ex15TING CONSTRUC'ION, EOUIPMENT, AND FINISHES NOTED TO BE
<br />REMOVED SHF'._L B-COME 'HE ?ROPERTY CF TNE CONTRACTOR AND
<br />WILL BE REMOVED FROM THE 51?E WITH THE �DLLOWIhG EXCEPTIONS:
<br />A. PROPERiv NOTED i0 BE REiURNED 70 THE OWNER.
<br />9. PROPERiY NOTED 10 BE REMOVED B� 7HE OwNER.
<br />}7, THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUIL�ING
<br />INSPECTORS SHALL PROVIDE THE MINIMUM SiANDAR�S FOR
<br />CONSTRUCI�ON TECHNIOUES, MATERIALS, AND FINISHES USED
<br />THROUGHOUT THE PROJFCT. iRADE STANDARDS Ati'D/OR PU9LISHED
<br />MANUFACTURERS SPECIFICATIONS MEETING OR EXCEEDING DESIGN
<br />REQUIREM�NTS S!�ALL 9E USED POR MSTALLATION.
<br />38. WHEN REOUIRED STORAGE OF MATERiALS OCCURS, THE'! 5'�qLL B�
<br />EVENLY DISTRIBIITED OVER ROl1GH FRAM�D �LOORS OR ROOFS 50 AS
<br />NOi TO ExC[ED THE DESIGNED uVE LOADS FOR 7HE STRUCTURE.
<br />TEMPORARv SHORItiG ANp/OR BRACiNG i5 �0 9E PROVIDED WHERE THE
<br />S1RUC7URE tiA5 NOi AiiA'�NED TNE DESIG\� STRENGIH FOR 'HE
<br />CONUITIONS PRESENT.
<br />39. PRIOR TO 1!-E POl1RING OF ANY NEW SLA9 OVER AN E%ISTING SLAB
<br />THE CONTRACTOR SHALL VERiFY LOCATi06'S OF ALL OPENINGS, CHASES,
<br />AN� EQU�PMENT WHICH ARE 70 BE iMPLEUEN7ED iNTO THE NEw wORK.
<br />ALL ITEMS DESiGNATED TO 9E ABANDONED SHALL BE NOTED AND
<br />DISCUSSED WiTH THE OWNER ANC TOWER NEIWORK CARRIER
<br />CONS'RUCTION PRO�EC? MANAGER AS �AR- OF �HE AS-BIJ��T DRAW!NG
<br />PACKAGE.
<br />40. BUILDiNG iNSPEC�03S ANC/OR O�HER 9UILDMG OFFICiALS ARE TO BE
<br />NOiIFiED PRIOR '0 ANY GRADING, CONSTR'JCTiON, AND ANv OTHER
<br />PROJECT EFFORT AS MANDATED B� THE GOVERNING AGENCY.
<br />41. THE PROJECi, WHEN COMPLETED, SHALL COMPLY WITH LOCAL SECURITY
<br />CODES An�D TI7LF-z4 ENERG� CONSERVAiION REQUIREMENTS. (TI?LE-24
<br />WHEN APPLICABLE)
<br />42. ALL GLASS ANC GLP.ZING IS TO COMPLY WITH CHAPTER 54 OF THE U.S.
<br />CONSUM=R SAFEiY C0IAMISSION - SAFET' STANDARDS FOR
<br />ARCHITECTURAL GLAZING MATERIALS (42 FR 1428, CFR ?ART 1207)
<br />AND LOCAL SECURIN REQUIREMENTS.
<br />47. NEW CONSIRUCTION ADDED TO EXISTING CONSTRl1CT10N SHALL MATCH
<br />IN FORM, TE%7URE, FIN!SH, AND IN MAiERIALS ExCEP1 AS NOTED IN
<br />THE PLANS AND SPECIFlCATIONS.
<br />GENERAL NOTES (CONT'D):
<br />44. iHE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING,
<br />AND/OR SLEEV_5 2EOUIRE� FOR T.+= IVSTALLAT10N OF FIXTURES,
<br />MECHAN�CAL EQUIP41ENi, PLUMBING, HAR�WARE, AND FINISH IT�MS i0
<br />INSURE A PROPER AND COMPLE�E JOB.
<br />45. THE CONTRACTOR IS RESPONSIBLE FOR 'ROVOING A PROJECT LEVEL,
<br />STRAIGHT, AND -RUE ACCORDwG TO 7HE ?LANS. iHE CON7RACTOR
<br />SHALL COMPARE THE LINES AND LEVELS 0` THc E%ISTING COND::IONS
<br />WITH THOSE SHOWN ON THE PLANS PRIDR TO iHt STARi 0� ANY
<br />CONSTRUCTION. TOWER NETwORK CARRIER SHALL BE NOTIFIED OF ANV
<br />ERRORS, OMISSiONS, OR INCOn51STENCIES PRIOR TO ANV
<br />CONSTRUCTiON.
<br />46. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING
<br />PROPERTIES FRON. Pr.Y51CAL tiARM, NOISE, DUST, DIRT, AND FIRE AS
<br />REOUIRED BY TNE GOVERMnIG AGE�lCiES.
<br />47. WHERE SPECIFIED, A�ATERiALS 7ESTING SHALL BE TO THE LATES7
<br />STANDARDS AND/OR RNISiONS AVAILABLE AS REpUIRED BY THE
<br />GOVERNWG AGENC� RESPONSIBLE FOR RECORCING THE RESULTS.
<br />48. THE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL
<br />MATERIALS AND SHALL NOT D� SO ON FUB_IC PROPERTY WITHOUT A
<br />?E.�N�:T TO DO SO FRON iHE GOVERNING AGENCIES FOR THIS PURPOSE.
<br />49. GENERAL NOTES AND STANDAR� DETAILS ARE THE MINIMUM
<br />REQUIREMENTS �0 BE USED ,N COND,Ti0N5 WHICH ARE NOT
<br />SFEC�.FICA��L� S�CWN OIH=RWIS`c.
<br />50. TRADES INVOLVED IN THE PROJECI SHALL BE RESPONSIBLE FOR THEIR
<br />OWN CUTTING, FITTING, PATCHING, ETC., 50 AS TO BE RECENED
<br />PROPERLY BY iHE WORK OF OTHER TRADES.
<br />51. ALL DEBRIS AND REFUSE IS TO 6E REMOVED FROM THE PROJECT
<br />PREMISES AND SHALL BE �EFT IN A CLEAN (BROOM FINISH) CON�ITION
<br />AT ALL TIMES 8Y �ACH iRADE AS THEY PERFORM THEIR OWN PORTION
<br />OF THE WORK.
<br />52. TOWER NETWORK CARRIER �OES NOT GUARAMEE ANY PRODUCTS,
<br />FI%TURES. AND/OR ANY EOUIPMEM NAMED BY P iRADE OR
<br />MANl1FAC1LIR.R. Gt1ARAVi'cE OR WARRANN TNAT MAY BE IN E�FECT IS
<br />�ONE SO THROUGH THE COMPANY OR MANUFAC7URER PROVIDING THE
<br />PRODUCT, FIxTURE, AND/OR `cOUIPM[NT ONLY: UNLESS SPECIFIC
<br />RESPONSIBILITv IS ALSO PROVIDED 9� 1�,E
<br />CONTRACTOR/SUBCONTRACTOR In� WRITiEN FORM.
<br />53. CONTRACTOR TO REPLACE AND/OR REROUTE ANY E%ISTING
<br />UNDERGROUND 'JTIL'TiES ENCOUN7ERED DURiNG iRENCNiNG AND
<br />GENERAL CONSiRUCT10N.
<br />54. CONTRACTOR TO LOCATE ALL UiILITIES PRIOR TO PLACEMENT OF
<br />MONOPOLE FOOTING AND OTHER SIRUCTURES TO BE ?LACED IN
<br />GROUND. SEE G-NE4AL NOTE �'6 ON THIS SHEEi.
<br />55. SEE CIVIL DRAWINGS FOR AUC�ITIONAL SITE INFORMATION.
<br />Sfi. CONTRACTOR TO DOCUA�ENT ALL WORK PERFORMED WIiH PHOTOGRAPHS
<br />AND SUBMIi TO TOWER NE'WORK CARRIER FLONG WITH REDLWED
<br />CONSTRUCTION SET.
<br />57. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BV
<br />N,ARi(ING UP (R�DLINING) TH: APPROVED CONSTRUCTION SEf AN�
<br />SUBMIZING THE REDLINED SET TO TOWER NEIWORK CARRIER UPON
<br />COMPLETION.
<br />58. 7HE �_NERAL CONTRACiOR SHALL BE RESPONSiBLE FOR AND SHALL
<br />REI�EDY ALL FAULIY, INFERIOR, AND/OR IMPROPER MATERIALS, DAMAGED
<br />GOODS, AND/OR FAULiY WORKMANSHIP FOR ON`[ (1) YEAR AFTER THE
<br />PROJ�C� IS COMPETE AND ACCEPTED UNDER THIS CONTRACT; UNLE55
<br />NO7EC 0?HERWISE w THE CONTRACT B�TWEEN THE OWNER AND �HE
<br />CONTRACTOR. (ExCEPT10N) 7HE ROOFING SOBCO�:TRACiOR SRALL
<br />FURNISH A MAMTENANCE AGREEMEN7 FDR ALL WORK DONE, COSIGNED
<br />BY THE GENERAL CON�RACTOR, i0 MaiN7AiN 7HE ROOFiNG iN A
<br />WATERTIGHT CONDITION FOR P PERIOD DF TWO (2) YEARS START:�G
<br />AfTER THE �ATE OF SUBSTANTIAL COMPiET10N OF THE PROJ�CT,
<br />UNLESS OTHERWISE W3ITTEN W 7HE CON7RACT BETw:EN iHE OWNER
<br />AND iHE CONTRACTOR.
<br />59. THE CONTRACTOR SHALL PR�VIDE ADEOUATE PROIECTION FOR THE
<br />SAFETY Of THE OWNE4'S EMPLOVEES, WORKMEN, AND ALL TIMES
<br />DURING 1HE CONS?RUCTION OF THE PROJEGT.
<br />60. THE CONTRACTOR SHALL BE REOUIRED TO PAY fOR ALL NECtSSARV
<br />PERMITS AN�/OR FEES WI`H RESPECT TO THE WORK TO COMPLETE THE
<br />PROJEC7. BUILD�vG PERMI? 2S�^L��CATIONS SHALL BE FILED B'! 7HE
<br />OWNER OR HIS REPRESEnTATNE. CONTRACTOR SHALL OBTA:N PERMIT
<br />AND A�AKE FINAL PAYMENT FOR SAID DOCJMENT.
<br />61. THE ARCHITECi/EVG;ti�ER IN CHARGE SHALL SIGN AN� SEAL ALL
<br />DRAWINGS AND/OR SPECIFICATIONS.
<br />62. TOWER NE7WORK CP.RRIER WILL REVIEW AND APPROVE SHOP DRAWINGS
<br />AND SAMPLES FOR CONFORIAANCE WITH DESIGN CONCEPi. TOWER
<br />NETWORK CARRIER PROJECT APPROVAL OF A SEPARATE IiEM SHALL NOT
<br />INCLUDE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS.
<br />63. ALL AN?ENNAS MOUNTED OK ROOF SUPPORT FRAMES TO BE PROVIDED
<br />Bv iOWER VE-WORK CARR'�E� �O�AMUNiCAiiONS.
<br />64. CONTRACIOR TO PROVIDE TR�NCH AS REOUIRED TO INSTALL BOTH
<br />ELECTRICAL AND TELEPHONE UNDERGROUND CONDUI7S (/�40 PVC) PER
<br />S.C.E. WORKORDER. BACKFILL WIiH CLEAN SAND AND COMPACT TO THE
<br />SATISFACTION OF iHE DISTRICTS INSPECTOR. REP;ACE FINISH GRADE
<br />WITH MATCHING MAiERIALS (GRA55, ASPHALT, CONCRETE, ETC.)
<br />65. COn;TRA�TOR TO PROVIDE I;EAW S1EEL PLA7E5 A7 OPEN TRENCHES
<br />FOR SAFETY AND TO PROTECi E%ISTING GROUND 5'JRFACES �ROM
<br />HEAW EQUIPMENT U1ILIZED DURING CONSTRUCTiON.
<br />66. CO':�TRACTOR TO PATCH AND REPAIR ALL GROUND SURfACES WITHIN
<br />THE CONSTRUCiION AREA AS NECESS4RV TO PROVIDE A UNIFORM
<br />SURFACE AND MAINTAIN E%ISTING SURFACE DRAINAGE SLOPES.
<br />fi7. CONTRACTOR TO REPLACE WNDSCAPE VEGETAiION THAT WAS DAMAGED
<br />DUE i0 CONSTRUCTION, AND TO MODIFY REMAINING �RRIGATION LINES
<br />TO OPERATING CONDiTiON, PROVIDING FULL COVERAGE TD iMPACTED
<br />AREAS.
<br />68. iN THE CASE OF ROOF?OP SOWTi0M15 fOR EQUiPMENT AND/OR
<br />ANiENNP FRAMES WHERE PENtTRAT10N OF E%IS-1NG ROOFING �AATFRIALS
<br />OCCUR, THE GENERAL CONTRACTOR SHALL COORDWAiE WITN BUILDING
<br />OWNER AND BUILD'.NG ROOFING CONTRACTDR OF RECORD FOR
<br />INSTALU710N, PATCh, REPAIR OR ANY AUGNEnTATION ?0 THE ROOF,
<br />AND HAVE THE wORK GUARANTEED uNDER iHE ROOFiNG CONTRACTOR'S
<br />wARRANTY FOR MOISTURE PENETRATiON OR AND O7HER FUTURE BREACH
<br />OF ROOFING INTEGRITY
<br />fi9. ALL WORK TO BE DONE BETWEEn' HOURS 0� d�.00 AA� ANO 5�.00 PM,
<br />E%CWDING HOLIDAYS.
<br />s
<br />�
<br />U
<br />L
<br />Q
<br />Z
<br />�
<br />�
<br />J �
<br />Qry >
<br />6L �
<br />C/�
<br />W�
<br />�N
<br />N
<br />W'n °'
<br />�.i �
<br />19401 40TH AVE. W., SUITE 304
<br />LVNNWOOD, WA 98�3fi
<br />PHONE: (425) ]40-6392
<br />FAX: (425) 224-16t4
<br />W W W.CAMPASSOC.COM
<br />DATE: 'i/�', _ ;
<br />DRAWN BY: ?A
<br />CHECKED BY: �'�
<br />REVISIONS
<br />REGISTERED
<br />� ARCHI ECT
<br />�UL NI
<br />OF ASHINGTON
<br />02/09/2016
<br />�;4�z�
<br />���, �q�J��rc
<br />�.1_\�_
<br />� � f� . l'�A 9c2J
<br />C-'.�_��- 7-�'�
<br />GENERALNOTES
<br />.. __ \�,s';�_-:
<br />G-1.0
<br />JOB No. WAfi299
<br />
|