Laserfiche WebLink
"**********Compliance Point Results ************'" <br />Scenario Predeveloped Compliance Subbasin: Big J <br />Scenario Postdeveloped Compliance Link: Detention Pond <br />*** Point of Compliance Flow Frequency Data *** <br />Recurrence Interval Computed Using Gringorten Plotting Position <br />Predevelopment Runoff Postdevelopment Runoff <br />Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) <br />2-Year 5.300E-02 2-Year 2.469E-02 <br />5-Year 7.270E-02 5-Year 3.563E-02 <br />10-Year 9.030E-02 10-Year 5.042E-02 <br />25-Year 0.121 25-Year 7.513E-02 <br />50-Year 0.139 50-Year 7.859E-02 <br />100-Year 0.148 100-Year 8.190E-02 <br />200-Year 0.190 200-Year 9.179E-02 <br />*� Record too Short to Compute Peak Discharge for These Recurrence Intervals <br />**** Flow Duration Performance **** <br />Excursion at Predeveloped 50%Q2 (Must be Less Than 0%): <br />Maximum Excursion from 50%Q2 to Q2 (Must be Less Than 0%): <br />Maximum Excursion from Q2 to Q50 (Must be less than 10%): <br />Percent Excursion from Q2 to Q50 (Must be less than 50°/o): <br />MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS <br />-54.2% PASS <br />-40.8% PASS <br />-43.6% PASS <br />0.0% PASS <br />