❑ <br />Stormwater Pollution Prevention P/an <br />Assess the effectiveness of erosion and sediment control measures <br />used to control the quality of stormwater discharges. <br />A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times. <br />Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP <br />are inadequate, due to the actual discharge of or potential to discharge a significant <br />amount of any pollutant, appropriate BMPs or design changes shall be implemented as <br />soon as possible. <br />Maintaining an Updated Construction SWPPP <br />This SWPPP shall be retained on-site or within reasonable access to the site. <br />The SWPPP shall be modified whenever there is a change in the design, construction, <br />operation, or maintenance at the construction site that has, or could have, a significant <br />effect on the discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicahle local or state regulatory authority, it is determined that <br />the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br />stormwater discharges fi•om the site. The SWPPP shall be modified as necessary to <br />include additional or modified BMPs designed to correct problems identified. Revisions <br />to the SWPPP shall be completed within seven (7) days following the inspection. <br />The BMP implementation schedule will be driven by the construction schedule. The following <br />provides a sequential list of the proposed construction schedule milestones and the corresponding <br />BMP implementation schedule. The list contains key milestones such as wet season <br />construction. <br />The BMP implementation schedule listed below is keyed to proposed phases of the construction <br />project, and reflects differences in BMP installations and inspections that relate to wet season <br />construction. The project site is located west of the Cascade Mountain Crest. As such, the dry <br />season is considered to be from May 1 to September 30 and the wet season is considered to be <br />from October 1 to April 3 <br />• Install stabilized construction entrance and access road: <br />• Begin rough grading: <br />• Relocate utilities and establish temporary power: <br />• Begin mass excavation for building: <br />� <br />07/16/2015 <br />07/16/2015 <br />07/21 /2015 <br />08/I 1/2015 <br />