Laserfiche WebLink
• Excavate and install new utilities and services <br />• Excavation and site grading ends: <br />Stormwater Pollution Prevention Plan <br />09/O 1 /2015 <br />09/24/2015 <br />• Begin implementing soil stabilization and sediment control BMPs throughout the site in <br />preparation for wet season: 09/24/2015 <br />• Wet Season starts: 10/O1/2015 <br />• Site inspections and monitoring conducted weekly and for applicable rain events as <br />detailed in section 6 of this SWPPP: 10/O1/2015 <br />• Implement Element #12 BMPs and manage site to minimize soil disturbance during the <br />wet season: 10/Ol/2015 <br />• Begin concrete pour and implement BMP C 151 <br />• Begin building construction: <br />• Dry Season starts: <br />• Site grading begins: <br />• Building core/shell construction complete: <br />• Final landscaping and planting begins: <br />• Building interior construction complete: <br />• Project Completion: <br />20 <br />10/16/2015 <br />11/Ol/2015 <br />05/O1/2016 <br />OS/16/2016 <br />OS/16/2016 <br />07/O 1 /2016 <br />OS/O1/2017 <br />OS/31/2017 <br />