Laserfiche WebLink
Stormwater Pollution Prevention Plan <br />6.0 Site Inspections and Monitoring <br />Monitoring includes visual inspection, monitoring for water quality parameters of concern, and <br />documentation of the inspection and monitoring findings in a site log book. A site log book will <br />be maintained for all on-site construction activities and will include: <br />A record of the implementation of the SWPPP and other permit requirements; <br />Site inspections; and, <br />Stormwater quality monitoring. <br />For convenience, the inspection form and water quality monitoring forms included in this <br />SWPPP include the required information for the site log book. This SWPPP may function as the <br />site log book if desired, or the forms may be separated and included in a separate site log book. <br />However, if separated, the site log book but must be maintained on-site or within reasonable <br />access to the site and be made available upon request to Ecology or the 1oca1 jurisdiction. <br />6.1 Site Inspection <br />All BMPs will be inspected, maintained, and repaired as needed to assure continued performance <br />of their intended function. The inspectar will be a Certified Erosion and Sediment Control Lead <br />(CESCL) per BMP C 160. The name and contact information for the CESCL is provided in <br />Section 5 of this SWPPP. <br />Site inspection will occur in all areas disturbed by construction activities and at all stormwater <br />discharge points. Stormwater will be examined for the presence of suspended sediment, <br />turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br />effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the <br />BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be <br />documented in the site log book or forms provided in this document. All new BMPs or design <br />changes will be documented in the SWPPP as soon as possible. <br />6.1.1 Site Inspection Frequency <br />Site inspections will be conducted at least once a week and within 24 hours following any <br />discharge from the site. For sites with temporary stabilization measures, the site inspection <br />frequency can be reduced to once every month. <br />23 <br />