My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br />6.0 Site Inspections and Monitoring <br />Monitoring includes visual inspection, monitoring for water quality parameters of concern, and <br />documentation of the inspection and monitoring findings in a site log book. A site log book will <br />be maintained for all on-site construction activities and will include: <br />A record of the implementation of the SWPPP and other permit requirements; <br />Site inspections; and, <br />Stormwater quality monitoring. <br />For convenience, the inspection form and water quality monitoring forms included in this <br />SWPPP include the required information for the site log book. This SWPPP may function as the <br />site log book if desired, or the forms may be separated and included in a separate site log book. <br />However, if separated, the site log book but must be maintained on-site or within reasonable <br />access to the site and be made available upon request to Ecology or the 1oca1 jurisdiction. <br />6.1 Site Inspection <br />All BMPs will be inspected, maintained, and repaired as needed to assure continued performance <br />of their intended function. The inspectar will be a Certified Erosion and Sediment Control Lead <br />(CESCL) per BMP C 160. The name and contact information for the CESCL is provided in <br />Section 5 of this SWPPP. <br />Site inspection will occur in all areas disturbed by construction activities and at all stormwater <br />discharge points. Stormwater will be examined for the presence of suspended sediment, <br />turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br />effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the <br />BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be <br />documented in the site log book or forms provided in this document. All new BMPs or design <br />changes will be documented in the SWPPP as soon as possible. <br />6.1.1 Site Inspection Frequency <br />Site inspections will be conducted at least once a week and within 24 hours following any <br />discharge from the site. For sites with temporary stabilization measures, the site inspection <br />frequency can be reduced to once every month. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.