My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br />6.1.2 Site Inspection Documentation <br />The site inspector will record each site inspection using the site log inspection forms provided in <br />Appendix E. The site inspection log forms may be separated from this SWPPP document, but <br />will be maintained on-site or within reasonable access to the site and be made available upon <br />request to Ecology or the local jurisdiction. <br />6.2 Stormwater Quality Monitoring <br />The applicant will monitor for the parameter(s) of concern described in the sections below and <br />document monitoring results in the site log book during construction. The applicant will manage <br />stormwater and construction dewatering discharges such that the discharge is consistent with <br />applicable water quality requirements. <br />Where there is no off site discharge from the construction site during a calendar week, sampling <br />is not required. Sampling is not required outside of normal working hours or during unsafe <br />conditions. <br />6.2.1 Turbidity Sampling <br />Monitoring requirements for the proposed project will include either turbidity or water <br />transparency sampling to monitor site discharges for water quality compliance with the 2005 <br />Construction Stormwater General Permit (Appendix D). Sampling will be conducted at all <br />discharge points at least once per calendar week. <br />Turbidity or transparency monitoring will follow the analytical methodologies described in <br />Section S4 of the 2005 Construction Stormwater General Permit (Appendix D). The key <br />benchmark values that require action are 25 NTU for turbidity (equivalent to 32 cm <br />transparency) and 250 NTU for turbidity (equivalent to 6 cm transparency). If the 25 NTU <br />benchmark for turbidity (equivalent to 32 cm transparency) is exceeded, the following steps will <br />be conducted: <br />Ensure all BMPs specified in this SWPPP are installed and functioning as <br />intended. <br />2. Assess whether additional BMPs should be implemented, and document <br />revisions to the SWPPP as necessary. <br />3. Sample discharge location daily until the analysis results are less than 25 <br />NTU (turbidity) or grcater than 32 cm (transparency). <br />If the turbidity is greater than 25 NTU (or transparency is less than 32 cm) but less than 250 <br />NTU (transparency greater than 6 cm) for more t11an 3 days, additional treatment BMPs will be <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.