Laserfiche WebLink
Stormwater Pollution Prevention P/an <br />7.0 Reporting and Recordkeeping <br />7.1 Recordkeeping <br />7.1.1 Site Log Book <br />A site log book will be maintained for all on-site construction activities and will include: <br />A record of the implementation of the SWPPP and other permit requirements; <br />Site inspections; and, <br />Stormwater quality monitoring. <br />For convenience, the inspection form and water quality monitoring forms included in this <br />SWPPP include the required information for the site log book. <br />7.1.2 Records Retention <br />Records of all monitoring information (site log book, inspection reports/checklists, etc.), this <br />Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit <br />requirements will be retained during the life of the construction project and for a minimum of <br />three years following the termination of permit coverage. <br />7.1.3 Access to Plans and Records <br />The SWPPP and Site Log Book will be retained on site or within reasonable access to the site <br />and will be made immediately available upon request to Ecology or the local jurisdiction. A <br />copy of this SWPPP will be provided to Ecology within 14 days of receipt of a written request <br />for the SWPPP from Ecology. Any other information requested by Ecology will be submitted <br />within a reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the <br />public when requested in writing. <br />7.1.4 Updating the SWPPP <br />This SWPPP will be modifiied if the SWPPP is ineffective in eliminating or significantly <br />minimizing pollutants in stormwater discharges from the site or there has been a change in <br />design, construction, operation, or maintenance at the site that has a significant effect on the <br />discharge, or potential for discharge, of pollutants to tl�e waters of tl�e State. The SWPPP will be <br />��� <br />