My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention P/an <br />implemented within 24 hours of the third consecutive sample that exceeded the benchmark <br />value. Additional treatment BMPs to be considered will include, but are not limited to, off-site <br />treatment, infiltration, filtration and chemical treatment. <br />If the 250 NTU benchmark for turbidity (or less than 6 cm transparency) is exceeded at any time, <br />the following steps will be conducted: <br />Continue daily sampling until the turbidity is less than 25 NTU (or <br />transparency is greater than 32 cm). <br />2. Initiate additional treatment BMPs such as off-site treatment, infiltration, <br />filtration and chemical treatment within 24 hours of the first 250 NTU <br />exceedance. <br />3. Implement additional treatment BMPs as soon as possible, but within 7 <br />days of the first Z50 NTU exceedance. <br />4. Describe inspection results and remedial actions taken in the site log book <br />and in monthly discharge monitoring reports as described in Section 7.0 of <br />this SWPPP. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.