Laserfiche WebLink
�J <br />Il�ll�l�rr��:Ly <br />March 25, 2016 <br />Carlos Alvarez <br />carlos@karreman.com <br />ENGINEERING / PUBL►C SERVICES DEPARTMENT <br />RE: Owner: SJ Realty Investments <br />Job Address: 11130 SE Everett Mall Way <br />Plan Check No: M1603-032 <br />Dear Mr. Alvarez, <br />In response to your application for the type 1 hood permit, your plans have been examined and you are <br />advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br />comments below. These comments address building issues only. Additional revisions or additions may be <br />required by other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br />International Building Code (IBC), the 2012 International Fire Code (IFC), the 2012 International <br />Mechanical Code (IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br />State of Washington and adopted by the city of Everett. The current IBC referenced standard for <br />accessible design is the 2009 ��Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal <br />ADA, FHA, and HUD regulations and standards, including the Fair Housing Accessibility Guidelines may be <br />more restrictive. <br />In order for the processing of your application to continue, it will be necessary to provide the <br />Building Division with two complete new sets of construction documents reflecting the <br />corrections requested. <br />1. Please provide information and detailing to verify the hood to wall clearance <br />requirements of IMC 507.9. <br />2. IMC 507.12 requires the hood to overhang the top edges of the cooking <br />equipment by 6". <br />3. The plans should include the requirement for a separate permit for the hood fire <br />suppression system. <br />4. The plans should include the requirement for a grease duct leak test prior to the <br />duct being covered. IMC 506.3.2.5. <br />If you have any questions, please call me at 425-257-7264. <br />Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br />All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, � - _ <br />Steve Miller <br />Associate Engineer <br />CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 •(425) 257-8200 • Fax (425) 257-8856 <br />