My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2017-04-10
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2017-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 7:58:09 AM
Creation date
12/13/2016 3:49:38 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Classrooms that are accessory religious educational rooms should be classified should be A-3, <br />per IBC section 303.1.4, and per the original permit. The occupant count can be based on <br />educational use for square footage, but the occupancy type would remain assembly. <br />c. All rooms used for assembly purposes should be shown on the drawings to have a posted <br />maximum occupancy sign, per IBC section 1004.3. <br />Eg ress <br />1. Room 117 should have egress and emergency lighting shown on the drawings, per IBC sections <br />1006.3, 1011.1, and Table 1015.1. <br />2. At minimum, doors in room 117 installed since the originai permit drawings should swing in the <br />direction of egress, per IBC section 1008.1.2. <br />Construction <br />1. Please indicate handrails on the new stairs accessing the stage, per IBC sections 1009.15 and 1012.1. <br />2. The new stage platform should be detailed on the construction drawings to show the framing and <br />methods of support. The section through the floor construction and supporting structure should <br />indicate one-hour construction. The specific materials and tested assembly number should be shown <br />on the drawings, with tested assembly numbers referenced on the details and specific materials <br />required for that tested assembly referenced on the details. <br />3. A section through the new one-hour rated ceilings is required for the basement and sanctuary ceiling. <br />The specific materials and tested assembly number for the construction should be shown on the <br />drawings. The details and notes currently shown for the new ceiling platform on the architectural and <br />structural drawings are cross-referenced and incomplete. <br />4. Please indicate on the drawings the scope of new work and materials in the toilet rooms, on sheet <br />A3.2. If the materials or fixtures shown in the elevations is either existing (untouched) or reinstalled, <br />please mark it as such. <br />5. Compliance with the requirements for enclosed attic spaces should be shown on the drawings for the <br />new sanctuary attic, per IBC section 1203.2. <br />Energy <br />1. Please show lighting reduction controls on the drawings, per WSEC C405.2.1.2. <br />2. Please show additional lighting controls on the drawings, per WSEC C405.2.2. <br />6. The new attic in the church will require insulation, per WSEC C101.4.3, to meet the R-value shown in <br />WSEC table C402.2. <br />Mechanical-Deferred Submittal <br />1. The modified volume of the sanctuary and the basement meeting room should be shown to be in <br />compliance with the outside air and mechanical ventilation requirements of IMC section 403. <br />
The URL can be used to link to this page
Your browser does not support the video tag.