Laserfiche WebLink
corridor loads to confirm the door egress capacity of the exit . <br />The building occupants are calculated at 858. <br />2. Please specify the new square foot area of the sanctuary, including the <br />e>cpansion from the former cry rooms in the occupancy calculations, separate <br />from the stage and sound booth areas, to show the complete occupancy load <br />calculations for this room, and for posting. <br />SABA Response: See sheet A1.2 for occupancy calculations. <br />., 3. A change of use to'E' occupancy is shown on sheet A1.2 but not on sheet A1.0. <br />a. A change to �E' occupancy would trigger the requirements for sprinklers, <br />per IBC section 903.2.3. <br />S�ABA Response: There is no change of use, the ��E" occupancy is <br />r�classified as A-3, see sheet A1.2 for occupancy types. <br />b. Classrooms that are accessory religious educational rooms should be <br />classified should be A-3, per IBC section 303.1.4, and per the original <br />- permit. The occupant count can be based on educational use for square <br />footage, but the occupancy type would remain assembly. <br />S�4BA Response: The religious educational rooms are reclassified to "A- <br />3" occupancy, see sheet A1.2 for occupancy types. <br />Egress <br />c. All rooms used for assembly purposes should be shown on the drawings <br />to have a posted maximum occupancy sign, per IBC section 1004.3. <br />S�4BA Response: Maximum occupancy signs are called for "A-3" <br />occupancies, see sheet A1.2. <br />1. Rc�om 117 should have egress and emergency lighting shown on the drawings, <br />pE�r IBC sections 1006.3, 1011.1, and Table 1015.1. <br />S�46A Response: Emergency egress lighting for room 117 is shown on <br />A2.5 & E2.2. <br />2. At: minimum, doors in room 117 installed since the original permit drawings <br />should swing in the direction of egress, per IBC section 1008.1.2. <br />S�4BA Response: All doors in Room 117 are existing. Door 117.1 the <br />swing has been reversed to swing in the direction of <br />egress see sheet A2.3. <br />Constru��tion <br />� 1. Please indicate handrails on the new stairs accessing the stage, per IBC sections <br />1009.15 and 1012.1. <br />S�4BA Response: Stairs have been deleted at the stage, hand rails are <br />not req�ocec�. <br />2. TP�e new stage platform should be detailed on the construction drawings to show <br />the framing and methods of support. The section through the floor construction <br />arid supporting structure should indicate one-hour construction. The specific <br />materials and tested assembly number should be shown on the drawings, with <br />Eastlake Community Church 2 of4 Aug. 28, 20>3 <br />B1307-015 <br />