' SF�ECIFICATIONS FOR REINFORCED WALL <br />General <br />' 1. The contractor shall have an approved set of plans and specifications on site at all times during the construction of the wall. <br />The wall layout is the responsibility of the contractor. <br />2. Nelson Geotechnical Associates (NGA) shall observe and monitor the construction of the wall on a full-time basis. <br />3. Stratagrid geogrid or equivalent shall be used for this project. All geogrid and facing materials shall be approved by NGA <br />' prior to installation. <br />4. The contractor may use longer geogrid lengths than the design sections for ease of construction. The geogrid lengths may <br />not be shorter unless approved by NGA. <br />' Subqrade Preparation <br />1. The ground shall be prepared by removing surficial organics, loose soil and undocumented fill to expose competent soils as <br />approved by NGA. <br />2. Exisitng utilities shall be located and their depths varified in the field. If utility trenches or undocumented fill are encountered <br />' within the wall or reinforced fill subgrade, the subgrade shall be prepared as recommended and approved by NGA. <br />3. A generally level bench with a minimum width equal to the design length of the geogrid is required for placement of the <br />reinforced fill. The surface of the level benches should be compacted to an unyielding conditions approved by NGA. <br />4. The excavation shall be cleaned of all excess material and protected, as necessary, from construction traffic to maintain the <br />' intergrity of the subgrade. <br />5. The base of the excavation should be deep enough to satisfy a minimum embedment of 1.5 feet. If the wall foundation <br />subgrade exposes undocumented fill soils, these soils should be overexcavated by a minimum 1.0 feet and replaced with 1-1/4 <br />inch crushed rock. <br />' 6. The excavation walls shall be sloped back at 2H:1V for safety. If this is not feasible, specific recommendations for <br />maintaining excavation stability shall be provided by NGA. All WISHA/OSHA safety requirements shall be observed at all times <br />during construction. <br />Geoqrid Placement <br />' 1. The reinforcement shall be rolled out, cut to length, and laid at the proper elevation, location, and orientation. Orientation of <br />the reinforcement is of extreme importance since geogrids vary in strength with roll direction. The contractor shall be <br />responsible for the correct orientation. <br />2. Geogrid shall be placed at the location and elevations shown on the plans. The geogrid length is measured from the back of <br />' the blocks. <br />3. Prior to placing the fill, the geogrid shall be pulled to remove the slack and stretched by hand until taut and free of wrinkles. <br />Fill Placement <br />' 1. Structural fill, consisting of granular import soils or granular on-site material no greater than 3 inches in size, shall then be <br />placed upon the subgrade and geogrid. If larger rock is used in the fill, additional layers of geogrid may need to be used in the <br />reinforcement. The contractor shall prevent damage to the geogrid by placing the first lift of structural fill with at least a 1-foot <br />thickness. NGA shall approve materiai placed in the reinforced zone, before placement. <br />' 2. Structural fill shall have parameters equal to or better than those stated for the reinforced wall fill befow with less then 20 <br />percent passing the number 200 sieve. NGA may allow a higher silt content based on review of the wall design and proposed <br />fill parameters. <br />3. Soil density tests shall be performed as designated by NGA. <br />' 4. Fill soils in the wall area shall be compacted to at least 95 percent of the Maximum Dry Density (MDD) as determined by <br />ASTM D-1557. <br />5. The soil shall be placed in relatively uniform horizontal lifts not exceeding 10 or 12 inches in thickness. The lift thickness <br />shall not exceed the manufacturer's recommended depth for the compactive device used on the project. <br />' <br />1 <br />' <br />Drainage <br />1. A specific drainage system is shown on the plans. Alternative drains can be used based on conditions found in the field and <br />the material used within the reinforced zone. Changes to the drainage system should be approved by NGA prior to placement. <br />2. A drainage blanket 12 inches in width shall be installed directly behind the block facing and shall consist of 2-inch clean <br />crushed rock. All of the drainage materials shall have a fines content no greater than 5 percent passing the number 200 sieve. <br />A 4-inch rigid perforated pipe embedded in a minimum of one foot of pea gravel or washed rock and wrapped with filter fabric <br />shall be installed at the bottom of the drainage layer <br />3. Surface water shall not be allowed to pond in or near the reinforced fill zone during or after construction. <br />4. Suitable clean-outs shall be installed every 50 feet for future maintenance. <br />5. Surface water shall not be allowed to reach the drainage layer. <br />Desiqn Parameters <br />, Reinforced Wall Fill: 32 degrees, 0 PSF, 120 PCF <br />Retained Backfill: 32 degrees, 0 PSF, 120 PCF <br />Foundation Soil: 32 degrees, 0 PSF, 120 PCF <br />Internal Stability of Wall <br />Minimum Factor of Safety o� Geogrid Strength: 1.5 <br />Minimum Factor of Safety on Geogrid Puilout: 1.5 <br />Soil-Geogrid Interaction Coefficient: 1.0 <br />Percent Coverage of Geogrid: 100 Percent <br />' External Stability of Wall <br />Minimum Factor of Safety against Base Sliding: 1.5 Inspection <br />Minimum Factor of Safety against Overturning: 2.0 Wall construction shall be completed under the <br />Minimum Factor of Safety against Bearing Capacity: 2.0 direction of NGA. <br />' <br />C� <br />Retained Soil <br />Approximate Limits <br />of Excavation <br />Level Benches <br />8" Min. Low Permeable Soil <br />�� <br />Stratagrid Geogrid o/quilvalent <br />� <br />Reinforced Soil <br />Approximate Limits <br />of Excavation <br />Retained Soil <br />IMinimum Horizontal Separation of 20 teet I <br />I <br />Keystone Cap Unit <br />Keystone 21.5 -inch Standard Unit o <br />at 14V:1 H batter � <br />Unit Drainage Fill (3/4" � <br />Crushed Rock or Stone) �° <br />� <br />� <br />L <br />m <br />� <br />x <br />8" Min. Low Permeable Soil - <br />� <br />� <br />m <br />Max. Siope �6.H � <br />I <br />Crushed Rock _ <br />Reinforced Soil <br />Grid Depth (See Table Below) <br />Firm Foundation Soil <br />(to be approved by NGA pnor to installation) <br />*Nate: <br />Minimum wall embedment shall be a minimum of 1.5 feet. Wall <br />foundation subgrades should be overexcavated by a minimum <br />1.0 feet, compacted to an unyielding condition and 1-1/4-inch <br />crushed rock should be compacted in the overexcavation. <br />Keystone Cap Unit <br />Keystone 21.5 -inch Standard Unit <br />at 14V:1 H batter <br />Unit Drainage Fill (3/4" <br />Crushed Rock or Stone) <br />Minimum embedment <br />'(see note below) <br />Finished Grade <br />Unreinforced Concrete <br />or Crushed Stone <br />Leveling Pad <br />Wall subgrade to be verified in <br />the field and prepared in <br />accordance with NGA <br />recommendations. <br />4" Perforated PVC Pipe <br />Tightlined to Discharge at toe of slope <br />**SG200: Stratagrid 200 Geogrid, or equivalent <br />details\ Ke storn <br />Y � <br />U Y <br />�, m <br />m � <br />C <br />f!J m <br />•; c <br />� rn <br />� O <br />d � <br />r <br />tv M <br />� � <br />J <br />'a <br />Z <br />_ <br />W <br />'" <br />� <br />,Wn <br />V <br />Z <br />� <br />J <br />W <br />Z <br />� <br />WL <br />r <br />U <br />� <br />� <br />� <br />d <br />Z <br />4 <br />� <br />Z <br />N <br />� <br />N <br />(9 <br />� <br />J <br />O <br />'Wn <br />V <br />a�S <br />� <br />� <br />W <br />W <br />Z <br />� <br />z <br />W <br />J <br />a <br />U <br />Z <br />_ <br />U <br />W <br />N <br />0 <br />W <br />� <br />Y <br />U <br />O <br />m <br />a� � <br />U � <br />U <br />� O <br />� <br />C - <br />� � � <br />� � 0 <br />.� � � <br />� <br />.� � � <br />� � <br />t <br />Q � <br />O <br />.� <br />� <br />� <br />N <br />Y <br />N <br />� <br />� N <br />� � <br />z co <br />U CO <br />� � <br />O <br />� <br />�� <br />� N <br />M � U <br />�, �, _ <br />� � o <br />� � �, <br />��� <br />OL N <br />UU� <br />N � c <br />a� 3 <br />E o 3 <br />o � 3 <br />L C <br />O � <br />�� <br />