Laserfiche WebLink
�ddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Bellevue, WA 98009 <br />CIVIL ENGWEENING, LANU PLi\NNIMG, SURV6YING <br />January 7_8, 2016 <br />Eddy.stevens@Polygonhorr7es.com <br />RE: Finai Letter for Building 15 <br />Silv�rlake Center <br />2006, & 2004, - 112th PI SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Bui�ding 15 at Silveriake Center is in <br />substantiaf compliance with RCW 64.55 and is in substantiai compliance with the approved drawings <br />(based on plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this office. Thank you. <br />Respectfully, <br />Hal P. Grubb, P.E. <br />Director of F_ngineering Services <br />HPGIns <br />19780c.019. doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (vra emarl) <br />Thomas Heinz, Polygon Homes (via en7ail) <br />Michelle Dittman, Polygon Fiomes (via emai!) <br />Frank Mellas, Sound inspections, LLC jvia emai!) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX <br />BRANCH OFFICES • TUMWATER, WA � LONG BEFICH, CFl � ROSEVILLE, CFl � 5AN DIEGO, CA <br />www.barghausen.com <br />