Laserfiche WebLink
Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Believue, WA 98009 <br />CIVIL ENGWEf-RING. LAND PLANNIf�1G. SIJRV[VWfi <br />March 7, 2016 <br />Eddy.stevens@Polygonhomes.com <br />RE: Final Letter for Building 16 <br />Silverlake Center <br />2020, 2018, 2014, 2012 - 112th PI SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Buiiding 16 at Silverlake Center is in <br />substantial compliance witfi RCW 64.55 and is in substantial compliance with the approved drawings <br />(based on plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this offiice. Thank you. <br />Respectfully, <br />x� ,.��'I ,� ,.- <br />� <br />Hal P. Grubb, P.E. <br />Dir�,ctor uf En�ineering S�rvices <br />H PG/ns <br />19780c.021.doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (via email) <br />Thomas Heinz, Polygon Homes (via email) <br />Michelle Dittman, Polygon I-iomes (via email) <br />Frank Mellas, Sound Inspections, LLC (via email) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />1$215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX <br />BRANCH 01=FICES • 7UMWAT'ER, WA • LONG BEACH, CA • ROSEUIU_E, CA • SAN DIEGO, C�� <br />wwv✓.barghausen.com <br />