Laserfiche WebLink
2012 Washington State Ener Code Compliance Forms for Commercial, Gro R1, and > 3 story R2 and R3 <br />• • • • • • � ' � <br />2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 <br />ProjectAddress 3o-io wszcaT Loss Fox Lr� Date 2�21/2014 <br />The following information is necessary to check a permit application for compliance with the lighting, motor, and transformer requirements <br />in the 2012 Washington State Nonresidential Energy Code. <br />Applicability Code Location Building Department <br />(yes, no, n.a.) Section Component Information Required on Plans Notes <br />C405.6.1 Exterior building Schedule with fixture types, lamps, ballasts, watts per fixture; <br />rounds lightin lumens per watt for fixtures > 100 watts <br />ELECTRICAL POWER SYSTEMS Sections C405.7 ,C405.9, C405.12, C409.2.1 <br />Electrical energy <br />C409.2.1 consumption — whole Meters provided for whole building electric energy usage <br />building <br />Electrical energy <br />C405.7 consumption — Individual dwelling unit electricity meters provided <br />dwelling units <br />C405.9 Transformers Indicate transformer size and efficiency on plans <br />Variable speed <br />C405.12.1 escalators and Variable speed controls provided <br />moving walks <br />C405.12.2 Regenerative drives Variable frequency regenerative drives provided for escalators <br />COMMISSIONING Sections C405.13, C408.3, C409.4.4 <br />C405.13 Commissioning Commissioning procedure developed for all applicable <br />systems <br />C408.3 Lighting controls Commissioning plan and functional test procedure developed <br />C409.4.4 Electrical energy Commissioning plan and functional test procedure developed <br />consumption meters <br />Escalators & moving Commissioning plan and functional test procedure developed <br />walks <br />If "no" is circled for any question, provide explanation: <br />