My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 12/5/2016
>
Contracts
>
Capital Contract
>
Interwest Construction 12/5/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:35:41 AM
Creation date
12/15/2016 11:35:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
12/5/2016
Council Approval Date
11/30/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Broadway Bridge Replacement
Public Works WO Number
PW3395
Tracking Number
0000396
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: September 8, 2016 ADDRESS: 609 North Hill BLVD <br /> CONTRACTOR: Interwest Construction CITY/STATE: Burlington, WA 98233 <br /> PROJECT TITLE: Broadway Bridge Replacement WORK ORDER NO. PW3395 <br /> DATE WORK COMPLETE: April 15, 2016 FINAL AMOUNT: $7,800,022.66 <br /> Exclusive of State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in <br /> said estimate. ��/ <br /> X President <br /> CONTRACTOR TITLE <br /> Interwest Construction <br /> Subscribed and sworn to before me this 15th day of September , 2016 <br /> x Jita_ Cht,?i <br /> Not lic u L� <br /> � �l�lli�i <br /> ; � •• • io•• of Washington,residing at Bellingham <br /> *OTAgy - <br /> n '0lmBL <br /> • o, p�� PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> � <br /> • W <br /> I Certify lip j mal estimate to be <br /> based upon actua measurements and to <br /> be true and correct. APPROVED Date L 1, <br /> x Ox i A _OF <br /> Construction Manager Public ? 7 Di ector <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 6/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.