My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 12/5/2016
>
Contracts
>
Capital Contract
>
Interwest Construction 12/5/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:35:41 AM
Creation date
12/15/2016 11:35:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
12/5/2016
Council Approval Date
11/30/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Broadway Bridge Replacement
Public Works WO Number
PW3395
Tracking Number
0000396
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Broadway Bridge Replacement <br /> Contractor: Interwest Construction, Inc. <br /> Work Order No. PW 3395 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> 0 <br /> ,/ I, <br /> Public t'orkDirector Date <br /> Dave Davis <br /> Approved by: <br /> ..A ' o rqs (IL <br /> Mayor, C •f Evere, Date <br /> ilRay Step'.os• <br /> Attest: j iii i if <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: ie.... . - t <br /> im Iles, City Atto <br /> 1Z1I. 11(. <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.