Run Date: 8/12/2016 City of Everett-Public Works Department Cutoff Date: 7/29/2016
<br /> Time: 10:48 AM Contract Estimate Voucher
<br /> Project: 321 For Work Order#3395B Contractor: INTERWEST CONSTRUCTION
<br /> BROADWAY BRIDGE REPLACEMENT Estimate#21 609 NORTH HILL BOULEVARD
<br /> WO 3395B BID:$2,018,182.82 BURLINGTON,WA 98233
<br /> TOTAL BID:$7,958,188.85
<br /> Unit Plan Total Previous Present Total Previous Present
<br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount
<br /> 0001 Temporary Traffic Control LS 17,250.00 1.00 1.0000 1.0000 0.0000 17,250.00 17,250.00 0.00
<br /> 0002 Traffic Control Supervisor LS 112,900.00 1.00 1.0000 1.0000 0.0000 112,900.00 112,900.00 0.00
<br /> 0003 Pedestrian Traffic Control LS 14,500.00 1.00 1.0000 1.0000 0.0000 14,500.00 14,500.00 0.00
<br /> 0004 Flaggers HR 47.00 2,000.00 2,340.5000 2,340.5000 0.0000 110,003.50 110,003.50 0.00
<br /> 0005 Other Traffic Control Labor HR 44.00 2,300.00 282.0000 282.0000 0.0000 12,408.00 12,408.00 0.00
<br /> 0006 Construction Liaison LS 64,000.00 1.00 1.0000 1.0000 0.0000 64,000.00 64,000.00 0.00
<br /> 0007 Uniformed Police Officer FA 1.00 20,000.00 38,205.7600 38,205.7600 0.0000 38,205.76 38,205.76 0.00
<br /> 0008 Construction Signs,Class A LS 18,000.00 1.00 1.0000 1.0000 0.0000 18,000.00 18,000.00 0.00
<br /> 0009 Additional Traffic Control Devices FA 1.00 15,000.00 10,030.7100 10,030.7100 0.0000 10,030.71 10,030.71 0.00
<br /> 0010 Portable Changeable Message Sign EA 16,000.00 4.00 4.0000 4.0000 0.0000 64,000.00 64,000.00 0.00
<br /> 0011 Type 3 Barricade EA 950.00 14.00 16.0000 16.0000 0.0000 15,200.00 15,200.00 0.00
<br /> 0012 Flexible Guide Post EA 65.00 50.00 52.0000 52.0000 0.0000 3,380.00 3,380.00 0.00
<br /> 0013 Temp Signal Mod Brdway @ Hewitt Ave. LS 22,400.00 1.00 1.0000 1.0000 0.0000 22,400.00 22,400.00 0.00
<br /> 0014 Temp Signal Mod Brdwy @ Everett Ave. LS 13,000.00 1.00 1.0000 1.0000 0.0000 13,000.00 13,000.00 0.00
<br /> 0015 Temp Signal Mod Everett Ave©Cedar St. LS 53,100.00 1.00 1.0000 1.0000 0.0000 53,100.00 53,100.00 0.00
<br /> 0016 Temp Signal Mod Hewitt @ Cedar St. LS 50,300.00 1.00 1.0000 1.0000 0.0000 50,300.00 50,300.00 0.00
<br /> 0017 Paint Line LF 0.50 9,370.00 16,074.0000 16,074.0000 0.0000 8,037,00 8,037.00 0.00
<br /> 0018 Painted Wide Line LF 0.50 2,270.00 2,940.0000 2,940.0000 0.0000 1,470.00 1,470.00 0.00
<br /> 0019 Painted Traffic Arow EA 95.00 28.00 48.0000 48.0000 0.0000 4,560.00 4,560.00 0.00
<br /> 0020 Painted Traffic Letter EA 28.00 92.00 112.0000 112.0000 0.0000 3,136.00 3,136.00 0.00
<br /> 0021 Painted Crosswalk Line SF 4.00 280.00 1,188.0000 1,188.0000 0.0000 4,752.00 4,752.00 0.00
<br /> 0022 Painted Stop Line LF 5.00 190.00 140.0000 140.0000 0.0000 700.00 700.00 0.00
<br /> 0023 Removing Paint Line LF 0.50 11,900.00 17,795.0000 17,795.0000 0.0000 8,897.50 8,897.50 0.00
<br /> 0024 Removing Painted Traffic Marking EA 28.00 120.00 97.0000 97.0000 0.0000 2,716.00 2,716.00 0.00
<br /> 0025 Removing Plastic Line LF 1.00 2,584.00 2,361.0000 2,361.0000 0.0000 2,361.00 2,361.00 0.00
<br /> 0026 Removing Plastic Crosswalk Line SF 3.50 560.00 1,166.0000 1,166.0000 0.0000 4,081.00 4,081.00 0.00
<br /> 0027 Roadway Surveying LS 28,000.00 1.00 1.0000 1.0000 0.0000 28,000.00 28,000.00 0.00
<br />
|