My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 12/5/2016 (2)
>
Contracts
>
Capital Contract
>
Interwest Construction 12/5/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:44:28 AM
Creation date
12/15/2016 11:44:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
12/5/2016
Council Approval Date
11/30/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer System M, Phase I Project
Public Works WO Number
UP3470
Tracking Number
0000397
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: September 20, 2016 ADDRESS: 609 North Hill Blvd. <br /> CONTRACTOR: Interwest Construction Inc. CITY/STATE: Burlinton, WA 98233 <br /> PROJECT TITLE: Sewer System M Phase 1 Project WORK ORDER NO. UP-3470 <br /> DATE WORK COMPLETE: July 8, 2016 FINAL AMOUNT: $10,948,154.77 <br /> Exclusive of State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in <br /> said estim e <br /> a,X X re-td,‘ <br /> CONTRACTOR TI'11,E <br /> Interwest Construction,Inc. <br /> Subscribe and sworn to before me this 21st day of September , 2016 <br /> X a----ft (,f <br /> No ublic <br /> uwit <br /> `, i � S <br /> _tate of Washington, residing at Bellingham <br /> *• OTAftfr•as NZ— <br /> u)• moo® •O_ <br /> � '• 0130%, �i� PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> 200°`'0�`��� <br /> I Ce�IA/Q�final estimate to be <br /> based upolli measurements and to <br /> be true and correct. APPROVED Date: to I <br /> X .•C uaZ:L X lI // <br /> Construction Manager Public frw Msec. <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 6/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.