My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 12/5/2016 (2)
>
Contracts
>
Capital Contract
>
Interwest Construction 12/5/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:44:28 AM
Creation date
12/15/2016 11:44:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
12/5/2016
Council Approval Date
11/30/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer System M, Phase I Project
Public Works WO Number
UP3470
Tracking Number
0000397
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Sewer System Replacement& Capacity Improvements Sewer"M" <br /> Contractor: Interwest Construction Inc. <br /> Work Order No. UP 3470 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /40 <br /> Publi ' orks Vector Date <br /> Dave Davis <br /> Approved by: <br /> t 6244 16. <br /> Mayorty of Ev ett Date <br /> Ray St, . anson <br /> Attest: _ <br /> ity Jerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> im es, City Attorn <br /> i2.-11 <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.