Laserfiche WebLink
.- . <br />September 21, 2015 <br />HWA Project No. 2014-090-21 <br />Fi�w•e 2. The boring has not been scheduled at this time due to the required City authorization <br />when conducting soils exploration in City right of way. <br />We appreciate the opportunity to provide geotechnical services on this project. Please feel free <br />to call if you have any questions or need additional information. <br />Sincerely, <br />HWA GEOSCIENCES INC. <br />��� "�` ��� / <br />Donald J. Huling, P.E. <br />Geotechnical Engineer, Principal <br />Attachments: <br />Figure 1 <br />Figure 2 <br />Appendices: <br />Sandy Ramos, P.E. <br />Geotechnical Engineer <br />Proposed Exploration Plan (Phase 4) <br />Pt•oposed Traffic Control Plan (Phase 4) <br />Appendix A Pictures of proposed drilling equipment <br />Figure A-1 Picture of Mini Track BobCat Mounted Drill Rig <br />H WA Work Ylan Lxpl�uiation (Ph�sc-4) <br />Gr�nd Avenue Pedestrian Qridge <br />Z/6 <br />