My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 12:01:02 PM
Creation date
12/16/2016 11:59:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Print Application Page 6 of 24 <br /> Scope of Work(Page 1 of 2) <br /> Title of your proposed activity(should include the type of activity and location): <br /> City of Everett Hazard Mitigation Plan Update <br /> Proposed types of Mitigation Activity(ies): <br /> Activity Code Activity Name <br /> 91.1 Local Multihazard Mitigation Plan <br /> If Other or Miscellaneous selected above, please specify: <br /> Describe the geographic area(s)to be covered by the planning activity: <br /> All land included within the City of Everett's city limits. The City of Everett is the seat of Snohomish County <br /> and its largest city. The city is located on a peninsula at the delta of the Snohomish River in the west central <br /> portion of Snohomish County. It borders Port Gardner Bay and includes approximately 15%tidal water within <br /> its area of 47.7 square miles. <br /> Source(s) of hazards specific to the geographic area to be addressed by the planning activity: <br /> Tsunami, Fire, Other(Specify in Comments),Volcano, Flood, Severe Storm(s), Mud/Landslide, Earthquake, <br /> Toxic Substances <br /> Scope of Work(Page 2 of 2) <br /> Option that describes the intent of this planning application: <br /> Update <br /> If a plan update, describe the evaluation process of the existing plan for its strengths, weaknesses and utility: <br /> The contract team,with the assistance of the Emergency Management Director(Director),will evaluate the <br /> existing 2011 City of Everett Hazard Mitigation Plan to identify where new or updated information will be <br /> incorporated. The team will conduct a section by section inventory of the existing plan to identify where any <br /> gaps in information exist. The contract team will review the identified hazards as well as the existing plan's <br /> goals and action items and consider revising them if warranted by changing conditions in the City of Everett. <br /> The contract team will also review the existing plan's implementation strategies for the action items to <br /> determine if they have been effective and are still relevant or need to be revised. <br /> Describe the process for implementing this planning activity, including the following plan development <br /> requirements: 1) participation of agencies, stakeholders and the public; 2) hazard identification and <br /> risk/vulnerability assessment; 3) mitigation strategy; 4)plan adoption; and 5) plan maintenance: <br /> Everett OEM will hire a contractor to update the Everett Hazard Mitigation Plan. The Emergency Management <br /> Director(Director)will oversee and work with the selected contractor team.The contractor team will report to <br /> the Director and be responsible for several key activities. It is estimated to take four weeks to bring a <br /> contractor on board. The contractor team, with the support of the Director,will conduct partner agency, <br /> stakeholder, and public engagement in the plan update process. They will use public forums, collaborative <br /> meetings, press releases, web-based tools, social media, and other means to encourage participation from <br /> the community. The contractor team will establish public meeting schedules through the City of Everett's <br /> Council of Neighborhoods for citizens, business, and government and education stakeholders to participate. <br /> The contractor team will compile public input gathered through engagement activities to apply to updating the <br /> mitigation goals and the City of Everett Hazard Inventory and Vulnerability Analysis(HIVA). Everett's World <br /> Café style public forum for the City of Everett 2011 Hazard Mitigation Plan update was recognized as a <br /> successful community involvement approach in FEMA's Local Mitigation Planning. Everett Emergency <br /> Management and the contractor team will explore utilizing this method or a modified version of it to engage <br /> 164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.