My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Brown and Caldwell 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2016 3:52:48 PM
Creation date
12/27/2016 3:52:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Design Build - WFP East Clearwell Roof
Public Works WO Number
UP3662
Tracking Number
0000409
Total Compensation
$190,067.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1: SCOPE OF WORK <br /> CITY OF EVERETT <br /> WATER FILTRATION PLANT CLEARWELL ROOF REPLACEMENT <br /> DESIGN BUILD CONSULTING SERVICES <br /> INTRODUCTION <br /> This scope of work describes Brown and Caldwell's(Consultant) consulting support for Everett's (the <br /> City's) Water Filtration Plant Clearwell Roof Replacement Project. The City has elected to use <br /> Design-Build (DB) delivery for the Project. The Consultant will support Everett's efforts to obtain <br /> Capital Projects Advisory Review Board (CPARB) approval,to procure a Design-Build firm, and to <br /> oversee the Project during design and construction. <br /> This scope of work is divided into three phases: <br /> • Phase 1-DB Procurement: <br /> o Support for obtaining CPARB Project Review Committee (PRC) approval <br /> o DB RFQ preparation <br /> o Assist/ advise the City on short listing DB firms <br /> o DB RFP preparation including preparation of performance and technical <br /> requirements <br /> o Assist/ advise the City on selection of a preferred DB contractor <br /> o Assist the City in contract negotiations <br /> • Phase 2-Oversight during Design: <br /> o Review of the DB firm's design <br /> o DB contract compliance support <br /> • Phase 3-Oversight during Construction: <br /> o Roof fabrication factory inspections <br /> o Construction field inspections to supplement the City's construction management <br /> staff <br /> o DB contract compliance support including acceptance and project closeout <br /> GENERAL ASSUMPTIONS <br /> Overall assumptions for the scope of work include: <br /> • CPARB - PRC Application:The City will provide background information required to complete <br /> the CPARB- PRC Project application form including City project and staff experience, <br /> financial/funding information,technical information, and history of audits findings. <br /> • Legal:The City will select/develop the DB contract and provide legal review. It is assumed <br /> the City will use/ modify the existing contract used for the City's Reservoir 6 project. The <br /> Brown Caldwell --- <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.