My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 12/27/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Brown and Caldwell 12/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2016 3:52:48 PM
Creation date
12/27/2016 3:52:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
12/27/2016
Council Approval Date
12/21/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Design Build - WFP East Clearwell Roof
Public Works WO Number
UP3662
Tracking Number
0000409
Total Compensation
$190,067.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Field inspection support during installation of the roof system and application of field <br /> coatings. <br /> • The scope assumes the City will take the lead in providing oversight, contract administration, <br /> and special inspections during construction. <br /> Deliverables(as requested by the City): <br /> • Factory Observation Report <br /> • Field Inspection Reports <br /> Phase 4 — Owners Reserve <br /> Phase 4 is a $20,000 budget reserve to provide additional support as requested by the City. <br /> Consultant will utilize the budget contained in Phase 4 only upon written direction from the City. <br /> — — — Brown-c Caldwell -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.