Laserfiche WebLink
••'�" '_'�1 ! lil�l}It�lile'E�ii��E�}eEyZr�.t,.,.�k. <br /> �tE <br /> '1"'E•'i4;5"''4444 nth°iii+i r!�� !l99�%i � lafit <br /> . Ny <br /> ,$. ai <br /> •2016 Updates to EMC 14 . 28 <br /> Changes for projects that disturb less than one acre: <br /> > Construction Stormwater Pollution Prevention Plan required <br /> > Enhanced treatment of stormwater runoff required for <br /> industrial, commercial, multi-family, & roads with 7,500 AADT <br /> > Flow control standards (detention): <br /> • Continuous simulation modeling required for hydrologic analysis <br /> • Required to use forested for pre-developed land condition <br /> instead of existing conditions <br /> • Flow duration matching for control of stormwater flows <br />