Laserfiche WebLink
.;i64E Epi' i <br /> 11, 1,y ill,rrt' <br /> ii,,i <br /> 2016 Updates to EMC14 . 28 <br /> For all projects, on-site stormwater management will be <br /> required to be met by using either: <br /> Prescribed list of LID BMPs from Ecology Manual, or <br /> Demonstrating compliance for infiltration standard using <br /> continuous simulation modeling <br /> Not changing is the ability to demonstrate when on-site <br /> stormwater management is infeasible, now this process is <br /> more defined in the Ecology Manual . <br />