My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 7 <br /> Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> Engineer will have direct communications during the normal course of performing their contractual <br /> obligations. KBA will communicate to the CSS team through the KPFF PM. <br /> 1.40—General Team Communications and Management(assume 18 minutes/day) <br /> This subtask will include email and phone communications with the CSS team. <br /> 2, TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> KPFF will provide survey services throughout the duration of construction. These services will be provided <br /> to the City on an on-call/as-needed basis, as authorized by the City. <br /> 3, GEOTECHNICAL ENGINEERING SUPPORT <br /> HWA will provide the following geotechnical services as directed by the City during the construction <br /> phase: <br /> 3.10—Geotechnical Construction Engineering <br /> This effort will include one pre-construction meeting, submittal review, construction engineering on <br /> an as-needed basis, dewatering rate analysis, and railroad coordination on an as-needed basis. <br /> 3.20—Geotechnical Observation and Associated Field Engineering <br /> For the East Abutment,this effort will include utility excavation and shoring as well as installation of <br /> drilled shafts. For the West Abutment, effort includes sheetpiie installation , installation of drilled <br /> shafts, and utility excavation and shoring. For this subtask, HWA will also install the slope protection <br /> system and attend construction meetings. <br /> 3.30—Project Management <br /> In order to fulfill this task, HWA will also require effort for QA, budget tracking, communications, <br /> scheduling, and billing. <br /> 4. STRUCTURAL ENGINEERING SUPPORT <br /> KPFF will provide structural engineering support as needed by the City. Requested work includes, but is <br /> not limited to, the following items: <br /> 4.10—RFI review(assume 150 reviews @ 1.5 hours each) <br /> 4.20—Shop drawing review(assume original 350 drawings @ 0.75 hours each +duplicates @ <br /> 25% +re-submittals @ 25%) <br /> 4.30—Site visits (assume 1.5 per month for 14 months) <br /> 4.40—Develop final as-built plans (assume 80/120 sheets @ 2 hour CAD and 2 hour <br /> eng/sheet) <br /> 4.50—Respond/participation in technical questions and answers (assume 8 hours/month) <br /> 4.60—Drilled shaft submittal reviews (rebar, pre-con meeting, CSL,construction sequence) <br /> 4.70—Rebar shop drawing review: Tower, East&West abutment,foundations,deck slab, <br /> stairs <br /> 4.80—Construction sequence Structural review <br /> 4.90—Engineering reviews required per specs (onecall basis) <br /> 5. CIVIL ENGINEERING SUPPORT <br /> KPFF will provide the following civil engineering support as needed/required by the City: <br /> i 17 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.