My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/12/14 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/12/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 9:21:58 AM
Creation date
1/4/2017 9:20:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> This effort will include meeting attendance and coordination with the City of Everett, response to <br /> RFIs,ASIs and submittals, and general communication (emails, phone calls, general consultation). <br /> The City will provide work on the punch list visit and report preparation, and preparation of as-built <br /> for Civil Engineering Design Elements, though KPFF may provide support as needed. <br /> 6. COMBINED SEWER&STORMWATER SUPPORT <br /> HDR will provide the following Sewer&Stormwater services as needed during the construction phase.A <br /> total of 28 hours have been allocated for HDR services. <br /> 6.10—Project Invoicing &Controls <br /> 6.20—Site Visits <br /> 6.30—RFIs (4 total) <br /> 6.40—Submittal Reviews <br /> 7. ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> There is no Architectural Support needed for this phase of construction. <br /> 3. ELECTRICAL ENGINEERING SUPPORT <br /> There is no Electrical Engineering Support needed for this phase of construction. <br /> 9. LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> There is no Landscape Architecture&Irrigation Support needed for this phase of construction. <br /> 10. ENVIRONMENTAL SERVICES <br /> Environmental and Permitting support services will be provided on an on-call basis. <br /> 11. ELEVATOR DESIGN SUPPORT <br /> There is no Elevator Design Support needed for this phase of construction. <br /> 12. MECHANICAL SUPPORT <br /> There is no Mechanical Support needed for this phase of construction. <br /> 13. CONSTRUCTION MANAGEMENT SERVICES <br /> There are no Construction Management Services needed for this phase of construction. <br /> irra <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.