Laserfiche WebLink
COST ESTIMATE:GRAND AVENUE PARK BRIDGE-CONSTRUCTION MANAGEMENT CSS <br /> PHASE 9 (assume 16 months) <br /> NoGetBer 22,2016 The Greenbusch Group,Inc. I Greenbusch <br /> GRAND AVENUE PARK BRIDGE- Sr.Venial Vertical <br /> Principal Transportation Transportation CADD <br /> CONSTRUCTION MANAGEMENT&CSS Specialist Specialist MULTIPLIER: <br /> Item I SCOPE OF WORK 57425 I $47.60 I - $27.10 I 534.00 2.2944 <br /> 1 PROJECT MANAGEMENT&ADMINISTRATION - <br /> LaborSubtotal: 0 I 0 0 0 $0 <br /> 2 TOPOGRAPHIC&BOUNDARY SURVEY SUPPORT <br /> sYa <br /> Labor Subtotal: 0 0 0 I 0 $0 <br /> 3 GEOTECHNICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 I 0 0 0 $0 <br /> 4 STRUCTURAL ENGINEERING SUPPORT <br /> Labor Subtotal: o I 0 0 I 0 $0 <br /> 17- u.--_-:,4?_ 1.� ,An " ., To ' _ 5 4F} � tt••IfY• ti'T -- _ _ __ <br /> 5 CIVIL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 I 0 I 0 I 0 $0 <br /> 6 COMBINED SEWER&STORMWATER SUPPORT <br /> Labor Subtotal: 0 I 0 I 0 I 0 $0 <br /> 7 ARCHITECTURE&BRIDGE AESTHETICS SUPPORT <br /> Labor Subtotal: 0 I 0 I 0 f 0 $0 <br /> 8 ELECTRICAL ENGINEERING SUPPORT <br /> Labor Subtotal: 0 I o I 0 I o I 50 <br /> I <br /> 9 LANDSCAPE ARCHITECTURE&IRRIGATION SUPPORT <br /> Labor Subtotal: 0 I a I 0 I 0 50 <br /> -- - - _^ -- - . <br /> r <br /> ,Wk <br /> X10 ENVIRONMENTAL SERVICES <br /> ILabor Subtotal: 0 I o I 0 1. 0 $0 <br /> i - <br /> . ;. Rermfinrsa 1 ly,`''_ - _ <br /> 11 ELEVATOR DESIGN SUPPORT <br /> 11.10 Project Management&Administration 4 8 51,555 . <br /> 11.20 Bidding Support <br /> 11.21 Answer pro-bid questions 3 6 $701 <br /> 11.22 Review substitution requests 2 4 $467 <br /> 1123 Provide addendum 2 4 5 $857 <br /> 11.30 Design Services During Construction <br /> 11.31 Respond to RFIs(NTE 8) 8 12 $1.620 <br /> •11.32 Review shop drawings and submittals;provide written response 3 6 5701 <br /> 11.33 Provide clarifying sketches as maybe required(NTE 3) 2 4 10 51,247 <br /> 1134 Review re-submittal of shop drawings and submittals(NTE 1 re- 2 4 $467 <br /> review) <br /> 11.35 Visit site once during construction to review progress;provide written 5 6 $1,043 <br /> memo <br /> 11.38 Perform punchllst atsubstatial completion;provide writen memo 6 9 $1,215 <br /> 11.37 Perform final completion back-punch;provide written memo 5 8 $1,043 <br /> 11.38 Review O&M manual and provide written comments;(NTE 1 review 4 10 51,059 <br /> and 1 re-review) <br /> Labor Subtotal: 4 I 50 I 75 I 15 $11,976 <br /> 12 MECHANICAL SUPPORT <br /> Labor Subtotal: 0 0 I o_ I 0 11 $0 <br /> 13 CONSTRUCTION MANAGEMENT SERVICES <br /> Labor Subtotal: 0 I 0 I 0 I 0 $0 <br /> Labor Sum:I I 50 I 75 I 15 $11,976 <br /> Reimbursable Sum _ _. _ _ -._ .' " _ . $65 <br /> $12,049 <br /> 34 <br />