Laserfiche WebLink
• <br /> EXHIBIT 0-1 3 <br /> HWA GeoSciences Inc. <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE - CONSTRUCTION MANAGEMENT & CSS <br /> PHASES 9 & 2 <br /> Classification Total Hours X Rate = Cost <br /> Principal IX 13 X $82.93 = $1,078.09 <br /> Principal VIII 4 X $74.04 = $296.16 <br /> Geotech. Engineer VI 185 X $52.88 = $9,756.36 <br /> Hydrogeologist VI 32 X $40.00 = $1,280.00 <br /> Geotech. Engineer III 154 X $37.02 = $5,701.08 <br /> Geotech. Engineer I 128 X $32.69 = $4,184.32 <br /> Geologist V 36 X $32.69 = $1,176.84 <br /> Clerical 38 X $21.25 = $807.50 <br /> DSC Subtotal $24,280.35 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 188.40% X $24,280.35 = $45,744.18 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $24,280.35 = $7,284.11 <br /> Total HWA Labor Cost $77,308.63 <br /> Reimbursables <br /> Mileage (2,377 Miles x $0.545/mile) $ 1,295.47 <br /> Subtotal $1,295.47 <br /> rSrcbconsultant Total: $78,604.10 <br /> 35 <br />